Front_lift_1.jpg 544 hits | 23.97 KB | Posted: 6/29/03 This is what it looked like when we started
Front_lift_2.jpg 472 hits | 30.29 KB | Posted: 6/29/03 Another shot before the lift
8Picture_038.jpg 492 hits | 24.65 KB | Posted: 6/29/03 TTB out of the way, now to look at what is left
5Gettin_ready.jpg 459 hits | 29.58 KB | Posted: 6/29/03 Looks kinda funny with no parts
6Picture_036.jpg 463 hits | 19.88 KB | Posted: 6/29/03 Close up of stock brackets that are riveted on at the factory
7Picture_037.jpg 452 hits | 27.36 KB | Posted: 6/29/03 Front veiw, shows all the stock brackets
9Drillin_holes_for_brackets.jpg 468 hits | 25.15 KB | Posted: 6/29/03 Jon drilling thru the rivets that hold on the brackets
10Drilling_radias_arm_bracket_holes.jpg 431 hits | 24.87 KB | Posted: 6/29/03 Drilling out the radius arm brackets, you can also see the new lift brackets in the foreground
11More_drillin.jpg 450 hits | 28.95 KB | Posted: 6/29/03 More drilling, another veiw of the brackets
12See_the_new_brackets.jpg 434 hits | 28.73 KB | Posted: 6/29/03 Radius arm brackets relocated 18" back, clamped in place, now to drill new holes in the frame
13Axle_half_lookin_shiny.jpg 493 hits | 28.22 KB | Posted: 6/29/03 TTB half all cleaned, painted and new poly boshing installed
16New_radias_arm_is_18_inches_longer.jpg 559 hits | 22.2 KB | Posted: 6/29/03 New superlift radius arms are 18" longer than stock and are the new tubular design
17TTB_going_in.jpg 424 hits | 30.2 KB | Posted: 6/29/03 TTB axles going back into position
18TTB_is_back_in.jpg 451 hits | 32.83 KB | Posted: 6/29/03 Jacking the ends of the TTB up so we can tighten up the springs
19Putting_in_coils.jpg 422 hits | 31.35 KB | Posted: 6/29/03 Side veiw of the same thing
20Tightening_them_up.jpg 452 hits | 31.49 KB | Posted: 6/29/03 Springs are bolted in, starting to look good