File 5 of 29
Prev | Next

Share This
Url
Tag
Img
Thumb

Three walls built and laid down on the slab ready to erect. Rear and both sides. We'll stick build the front, main door wall.
img_0215.jpg | Hits: 909 | Posted on: 12/29/07 | View original size (572.15 KB)

Three walls built and laid down on the slab ready to erect. Rear and both sides. We'll stick build the front, main door wall.