1995 Ford F-150
Owner: MustangGT221         (All of this user's registries on SuperMotors)
From: Topsfield, MA, U.S.A.        (Other registries in MA)
Year, Make, & Model: 1995 Ford F-150        (Other Ford F-150s)
Avatar:
Nickname: Green Thunder
Mileage: 105
Engine: Coast High Perf. 393w (6.5L) Stroker (balanced/blueprinted).
4.030 Bore,3.85 Stroke, E9AE Block).
Cam (lift .480/.501-duration@.050 257/266 lobe sep of 112).
Ford Racing Timing Chain/Gear Set
Forged Probe Pistons, I-Beam Rods, Cast Crank, (9.5:1 comp).
GT-40Y heads, FMS 1.72 Roller Rockers, Hydraulic Roller Lifters, manley 7.9" pushrods, Edelbrock Truck Intake, BBK 56mm TB, MSD Pro-Billet Distributor, 75MM MAF meter, Edelbrock Water Pump.
FMS Short Headers, Bassani Y-Pipe/Cat.
Drivetrain: ZF 5 spd swapped in, D44 TTB and 8.8 rear end, 4.10 gears, ARB air locker in front, Auburn ECTED in rear, fully rebuilt. Larger axles are in future plans.
Notes: This truck has been almost 3 years in the making. I have built the truck to be very capable off road, but still have good on-road driveability. It's big, but it's fast and it sure is fun!
Last Updated: 5/4/2005
Hits: 1908
Album
Folder Hits Comments Created Updated
folder Pictures5003,45705/4/055/4/05
Newest Media Files
Engineblock6.JPG
694 hits | 57.5 KB | Posted: 5/4/05

My shortblock before assembly
Picture.jpg
736 hits | 60.33 KB | Posted: 5/4/05

This is what the engine looked like before any detail work.
complete7.JPG
697 hits | 73.15 KB | Posted: 5/4/05

Engine in chassis about to be reconnected.
valvecover.JPG
686 hits | 68.97 KB | Posted: 5/4/05

It took 3-4 days to paint these valve covers (25 labor hours).
complete1.JPG
644 hits | 53.42 KB | Posted: 5/4/05

Finished assembly.
Most Viewed Files
Picture.jpg
736 hits | 60.33 KB | Posted: 5/4/05

This is what the engine looked like before any detail work.
complete7.JPG
697 hits | 73.15 KB | Posted: 5/4/05

Engine in chassis about to be reconnected.
Engineblock6.JPG
694 hits | 57.5 KB | Posted: 5/4/05

My shortblock before assembly
valvecover.JPG
686 hits | 68.97 KB | Posted: 5/4/05

It took 3-4 days to paint these valve covers (25 labor hours).
complete1.JPG
644 hits | 53.42 KB | Posted: 5/4/05

Finished assembly.
Maintenance & Modification Logs
This user hasn't added any log entries, yet.
About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2025 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog