|
|
step 1: place vehicle on jack stands.
|
|
|
2nd photo before disassembly of rt frt hub and rotor
|
|
|
rt hub...looks like i had a water leak...completely saturated in dirt and oil...not sure whether to clean or replace...if replace will have good one from left side as spare.
|
|
|
left side after disassembly
|
|
|
Third member removed from vehicle...will clean and paint since I have it out.
|
|
|
Aussie locker components before install.
|
|
|
All cleaned up and ready for install of locker.
|
|
|
With aussie locker installed...just have to check tolarances...calls for between.145 - .170.
|
|
|
front axles before clean up and new u joint installation.
|
|
|
another shot of locker in carrier.
|
|
|
front view of carrier back in housing.
|
|
|
side shot of carrier in housing.
|
|
|
front drive line with third member out.
|
|
|
another shot of front end.
|
|
|
drive axles all clean and repainted.
|
|
|
2nd shot of frt axles waiting for reassembly...just waiting for new u-joints, bearings and seals to come in from Randys Ring and Pinion.
|