|
|
shot of floor with fuel pump access door removed
|
|
|
old tank skid plate....you can tell its taken its abuse.
|
|
|
under side shot with floor cut out.
|
|
|
new skid plate bolted in place
|
|
|
3/16 steel...gonna be hard to bend this.
|
|
|
skid plate fabbed out 3/16 steel
|
|
|
bolted up...sound pad added to cushion gas tank
|
|
|
tank installed and strapped down
|
|
|
hole cut in inner quarter
|
|
|
tape out for cutting out gas door.
|
|
|
opening cut out for relocation of gas door.
|
|
|
welded in and gas door re-installed.
|
|
|
inside shot of fuel neck reinstalled.
|
|
|
had the fuel lines extended.
|
|
|
extended 6 more inches over factory.
|
|
|
lines hooked back up...rubber fuel line wrapped around the steel braiding for portection.
|
|
|
filled in lower hole, and ground down...
|
|
|
just need to do the sides and the filler neck cover
|
|
|
I forgot how much I hate body work.
|
|
|
mounted down and started undercoating
|
|
|
undercoated and filler neck housing on
|
|
|
false floor...3/4 plywood....
|
|
|
rear shot...no more low hanging tank.
|
|
|
here it is....the big sticker was my boys idea....
|
|
|
one last shot with tools and such packed back in...
|