|
|
Finnished tank assy ready for install
|
|
|
Close up of tank fittings
|
|
|
Side of Bag Assy.JPG | Hits: 1492 | Size: 78.02 KB | Posted on: 3/22/05 | Link to this image
Side View of Dual ported bag
OE 1/8" port on bottom
Added 1/4" port on top
|
|
|
Top of Bag with New 14 port.JPG | Hits: 1367 | Size: 67.46 KB | Posted on: 3/22/05 | Link to this image
Top of bag with added 1/4" port all fittings for bags use 3/8 OD Polly line
|
|
|
Bottom of Bag with Studs for Keeper Bar.JPG | Hits: 1410 | Size: 73.51 KB | Posted on: 3/22/05 | Link to this image
The studs were added so that a keeper bar could be used in place of the tab on the AIRLIFT lower bracket that was remove to provide room for the lower air line.
|
|
|
Keyed Strap End.jpg | Hits: 1223 | Size: 83.92 KB | Posted on: 3/22/05 | Link to this image
|
|
|
Durring Phase One.JPG | Hits: 1360 | Size: 63.49 KB | Posted on: 3/22/05 | Link to this image
My Work Space
|
|
|
Air Bag at 35 PSI.JPG | Hits: 1281 | Size: 69.17 KB | Posted on: 3/22/05 | Link to this image
|
|
|
Air Lines to Bags.JPG | Hits: 1149 | Size: 58.42 KB | Posted on: 3/22/05 | Link to this image
|
|
|
Tank Mounting Stud.jpg | Hits: 1312 | Size: 39.08 KB | Posted on: 3/22/05 | Link to this image
This is the single stud that mounts the tank, an access hole was drilled to allow you to get the upper nut and washer in place
|
|
|
Left side Tank Now Removed.JPG | Hits: 1613 | Size: 59.28 KB | Posted on: 3/22/05 | Link to this image
I started with a tank like this on each side but just did not like it.
|