File 3 of 5
Prev | Next

Share This
Url
Tag
Img
Thumb

still-plumbing.jpg The plumbing.  Pump output flows through an in-line heater (6500W @ 220V) then into the drum through a Rilla Biofuels' 2-Pipe Drum Port through the long tube.  Pump return is through the short tube with a 90deg fitting so it draws "down" from the glycerin flow in the drum.  Condenser is plumbed in the top, smaller port on the drum.
still-plumbing.jpg | Hits: 392 | Posted on: 1/14/08 | View original size (1.24 MB)

The plumbing. Pump output flows through an in-line heater (6500W @ 220V) then into the drum through a Rilla Biofuels' 2-Pipe Drum Port through the long tube. Pump return is through the short tube with a 90deg fitting so it draws "down" from the glycerin flow in the drum. Condenser is plumbed in the top, smaller port on the drum.