[email protected] (4).JPG 549 hits | 85.97 KB | Posted: 5/13/05 (Posted in: Dirty @ Work)
[email protected] (5).JPG 562 hits | 92.53 KB | Posted: 5/13/05 (Posted in: Dirty @ Work)
[email protected] (6).JPG 585 hits | 94.33 KB | Posted: 5/13/05 (Posted in: Dirty @ Work)
MVC-002F.JPG 576 hits | 98.41 KB | Posted: 5/13/05 ON MAIN ST. (Posted in: Stugis 03)
MVC-004F.JPG 668 hits | 9.33 KB | Posted: 5/13/05 COOL on MAIN ST (Posted in: Stugis 03)
MVC-020F.JPG 536 hits | 43.26 KB | Posted: 5/13/05 My digs at the Buffalo Chip - Stage Hill / Strokers Camp (Posted in: Stugis 03)
MVC-025F.JPG 522 hits | 52.08 KB | Posted: 5/13/05 The CAMP VIEW (Posted in: Stugis 03)
MVC-007F.JPG 536 hits | 40.63 KB | Posted: 5/13/05 Almost to Camp / 900 miles (Posted in: Stugis 03)
MVC-030F.JPG 501 hits | 53.47 KB | Posted: 5/13/05 My sons brick on the sidewalk of Main St. Sturgis, SD. (Posted in: Stugis 03)
NewHeritage.jpg 749 hits | 37.5 KB | Posted: 5/13/05 Bought in Sturgis 2k when my Shovel crapped out on me. (Posted in: BLUE FOUNDATION)
Tr2.JPG 534 hits | 48.29 KB | Posted: 5/13/05 The trailer... BEFORE Pepe` (Posted in: TRAILER)
Tr6.JPG 478 hits | 51.38 KB | Posted: 5/13/05 Strippin down for the transformation. (Posted in: TRAILER)
Test5.JPG 465 hits | 45.35 KB | Posted: 5/13/05 Carrier fit check and notice the all important swiveling hitch!!! (Posted in: TRAILER)
Almost8.JPG 438 hits | 39.52 KB | Posted: 5/13/05 Wired, Painted, Diamond Plated... so far so good!
Harley standard colors... Black & Harvest Orange (Posted in: TRAILER)
DoneTr5.JPG 477 hits | 59.24 KB | Posted: 5/13/05 Not to shabby! 20 cubic ft. of storage space... fits all the camping gear I need. (Posted in: TRAILER)
DoneTr8.JPG 392 hits | 60.01 KB | Posted: 5/13/05 what you would see on the road... haha (Posted in: TRAILER)
DoneTr1.JPG 538 hits | 61.52 KB | Posted: 5/13/05 READY TO ROLL!!! (Posted in: TRAILER)
DoneTr3.JPG 499 hits | 65.59 KB | Posted: 5/13/05 TOYS SHOT (Posted in: TRAILER)
BagSpace (1).JPG 984 hits | 57.41 KB | Posted: 5/13/05 hitch system... makes for a great hard bag mount (Posted in: CUSTOM BAGS)
fin_plate.JPG 531 hits | 56.11 KB | Posted: 5/13/05 weld on a flat bracket piece to mount the bottom of the bags on (Posted in: CUSTOM BAGS)
fin_platerubber.JPG 555 hits | 60.07 KB | Posted: 5/13/05 once you know where you have to sit those bags, drill out those holes. I also used a bit of rubber mat for vibration dampening. (Posted in: CUSTOM BAGS)
Fiberglass (4).JPG 506 hits | 56.1 KB | Posted: 5/13/05 if you can sling a little fiberglass, get some used bags and fix 'em up. If not... get help becouse there's much more (Posted in: CUSTOM BAGS)
Fiberglass (1).JPG 537 hits | 54.16 KB | Posted: 5/14/05 bags come with a channel for a bar mount.
cut inside bottoms flat with the braket mounting channel and glass the hole flat across.
cardboard and tinfoil can do wonders with fiberglass. (Posted in: CUSTOM BAGS)
BagIn_Braket.JPG 444 hits | 58.62 KB | Posted: 5/14/05 now we're getting somewhere... (Posted in: CUSTOM BAGS)
tools.JPG 532 hits | 39.71 KB | Posted: 5/14/05 good stuff for this job. rubber is your friend (Posted in: CUSTOM BAGS)
Fit2.JPG 537 hits | 43.09 KB | Posted: 5/14/05 start taking measurement and be carefull, fit is real tight here... (Posted in: CUSTOM BAGS)
ClearSeat.JPG 595 hits | 56.55 KB | Posted: 5/14/05 gotta clear the seat (this stock seat was later swapped out for a nice corbin. gave me alot more room. too bad I didn't see that coming. (Posted in: CUSTOM BAGS)
ClearSwingArm.JPG 572 hits | 41.11 KB | Posted: 5/14/05 pay very close attention to the clearance for the softail swing arm. it would be a real drag to do all this work and then have a pothole send that bolt up and into that fiberglass bag. (Posted in: CUSTOM BAGS)
ClearTaillight.JPG 535 hits | 56.59 KB | Posted: 5/14/05 Check clearance for the taillights too. again this one is a very tight fit. (Posted in: CUSTOM BAGS)
fin_brackets.JPG 520 hits | 53.51 KB | Posted: 5/14/05 once the bags are properly set into the bottom, whip up some upper brackets to hang off the rear strut and seriously stabalize those bags. I used some metal strips and bent them to the exact specs I needed. Your bikes may differ, but you get the idea... (Posted in: CUSTOM BAGS)
fin_bagin.JPG 566 hits | 48.87 KB | Posted: 5/14/05 MOUNT THOSE BAGS!!! (Posted in: CUSTOM BAGS)
fin_open.JPG 903 hits | 39.49 KB | Posted: 5/14/05 Assemble al lthe bag lids and hinges and locks, etc. etc. (Posted in: CUSTOM BAGS)
fin_full_l.JPG 660 hits | 59.95 KB | Posted: 5/14/05 All together and seems to fit as if it was OEM (Posted in: CUSTOM BAGS)
fin_full_back.JPG 918 hits | 26.61 KB | Posted: 5/14/05 all you'd ever see on the road... haha (Posted in: CUSTOM BAGS)
[email protected] (5).JPG 934 hits | 92.53 KB | Posted: 5/14/05 Of course this project had to be finished up with a complete paint job to bring it all together... more on the end paint in other folders (Posted in: CUSTOM BAGS)
HogPlugInside.JPG 545 hits | 41.54 KB | Posted: 5/13/05 Wiring up the rear for the trailer hitch connection.
Had to get a little creative, since I was too cheap to buy a proper wiring kit from the hitch manufacturer. (Posted in: Hitch)
HogPlug.JPG 547 hits | 41.33 KB | Posted: 5/13/05 what's visible... until the hitch hides even that (Posted in: Hitch)
Hitchon2.JPG 708 hits | 45.89 KB | Posted: 5/13/05 camera sucked, but the hitch is on and ready! (Posted in: Hitch)
HogHitch Pg3.jpg 543 hits | 43.71 KB | Posted: 5/13/05 assembly instructions... incase you were wondering how it all went together (Posted in: Hitch)
Fargo to Spokane (1).JPG 434 hits | 51.55 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
Fargo to Spokane (3).JPG 406 hits | 58.14 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
Fargo to Spokane (5).JPG 373 hits | 72.07 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
Fargo to Spokane (6).JPG 370 hits | 71.01 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
Fargo to Spokane (7).JPG 403 hits | 66.18 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
Fargo to Spokane (10).JPG 458 hits | 53.26 KB | Posted: 8/21/05 (Posted in: Fargo-Spokane)
|