|
|
only took about an hour to remove everything.
|
|
|
This pic the lower BJ is removed and working on removal of the upper. Install starts with the upper and then the lower. The clamp remains in the same position as shown, but for install you swap the receiver tube out for a press tube that just fits around the body of the balljoint, but rests on it's lip and pushes the joint in from the top. on the bottom is a little cut with just enough clearance for when the BJ body protrudes from the bottom.
|
|
|
trying moog BJ this time instead of spicer non-greasables. These are interesting with the zerk placement. Probably the only zerk location that would work with the alloy shafts I have.
|