Url
Tag
Img
Thumb

WindowPrare.jpg | Hits: 220 | Size: 63.86 KB | Posted on: 6/11/16 | Link to this image


White vinyl low-E windows with prarie caming

Url
Tag
Img
Thumb

Door2panel.jpg | Hits: 181 | Size: 45.57 KB | Posted on: 6/11/16 | Link to this image


Interior doors

Url
Tag
Img
Thumb

PocketDoorHdwr.jpg | Hits: 180 | Size: 77.84 KB | Posted on: 6/11/16 | Link to this image


Pocket door handles; bought this one; need 5 more NON-latching

Url
Tag
Img
Thumb

Brick-HenryCopperMill.jpg | Hits: 362 | Size: 103.73 KB | Posted on: 6/11/16 | Link to this image


Bricks will be Acme Highland Gray, similar to this.

Url
Tag
Img
Thumb

Stone6.jpg | Hits: 239 | Size: 99.28 KB | Posted on: 6/11/16 | Link to this image


Stone siding to be used outside the fireplace, and as quoins at most of the corners.

Url
Tag
Img
Thumb

Fireplace.jpg | Hits: 192 | Size: 108.52 KB | Posted on: 6/11/16 | Link to this image


Woodburning fireplace with gas lighter will have red herringbone refractory panels, glass doors with platinum frames, and forced fresh air from louvers. There will be fake stone inside; real stone outside; no hearth extension; no TV mount; and the mantle will probably be made locally from cedar that grew on our property.

Url
Tag
Img
Thumb

FloorLR-864Harms-QCSmvl.jpg | Hits: 212 | Size: 55.5 KB | Posted on: 6/11/16 | Link to this image


Floor tile Marazzi Harmony Pitch 6x36" everywhere (1177sqft) except bedrooms & their closets, stairs, office, and master bath.

Url
Tag
Img
Thumb

Fleurco Aria Harmony Bathtub.jpg | Hits: 216 | Size: 600.3 KB | Posted on: 6/11/16 | Link to this image


Master bath tub: Fleurco Aria Harmony (bought)
Master tub faucet: Kohler Refinia K-T5325-4-BN & K-5328-BN Trim, K-302-K-NA Valve

Url
Tag
Img
Thumb

K-5328-BN-3.jpg | Hits: 139 | Size: 88.19 KB | Posted on: 8/27/16 | Link to this image


Her tub spout Kohler Refinia K-5328-BN

Guest tubs will use the popup version of this spout Kohler Refinia K-5327-BN.

Url
Tag
Img
Thumb

K-T5325-4-BN-2.jpg | Hits: 128 | Size: 100.23 KB | Posted on: 8/27/16 | Link to this image


Her tub handles Kohler Refinia T5324-4-BN

Url
Tag
Img
Thumb

Shower1-Qntm.jpg | Hits: 186 | Size: 72.6 KB | Posted on: 6/11/16 | Link to this image


Master shower will have a glass wall on the Left above the tub (24"), then a 1' wide inoperable panel on the front across from a 3' outswinging door hinged to a 1' wall on the Right. The control, fixed head, and adjustable wand will be on the right, below an accent strip that continues into the niche at the back.

Url
Tag
Img
Thumb

ShowerM6.jpg | Hits: 215 | Size: 66.63 KB | Posted on: 6/19/16 | Link to this image


The master bathroom & shower walls (209sqft) will be 18" Italian Carrarra Bianca marble (we bought 120pcs - 270sqft) laid at 45° to the celing in the shower, and 2 tiles high (~51") in the rest of the bathroom. At the height of the shower niche (~53") only inside the shower, there will be an 11.5sqft accent band of Bliss mosaic. The 24sqft shower floor will be the same marble but in a basketweave pattern with black marble dots called Trenza mosaic.

The master bath floor will be gray 12x24" tile that remains to be chosen.

There probably won't be enough marble to do the 61sqft of wall in the toilet stall.

Url
Tag
Img
Thumb

SurrTile-2FlrtnScabos-Lowes.jpg | Hits: 115 | Size: 63.49 KB | Posted on: 8/27/16 | Link to this image


Tub surround tile for both guest baths will be Florentine Scabos porcelain.

Url
Tag
Img
Thumb

Toilet.jpg | Hits: 157 | Size: 85.37 KB | Posted on: 6/11/16 | Link to this image


Toilets

Url
Tag
Img
Thumb

Vanity-Triton.jpg | Hits: 179 | Size: 43.94 KB | Posted on: 6/11/16 | Link to this image


Vanity sinks will probably be trench style; white in the master, and biscuit in the guests.

Url
Tag
Img
Thumb

MoenZarina1.jpg | Hits: 190 | Size: 58.29 KB | Posted on: 6/11/16 | Link to this image


All vanity faucets are Moen Zarina L84533SRN withOUT base plate; Bought 5

Url
Tag
Img
Thumb

KitchSink-RCFU3119R-177Amznn.jpg | Hits: 171 | Size: 18.11 KB | Posted on: 6/11/16 | Link to this image


Kitchen sink undermount Revere RCFU3119R

Faucet w/o baseplate centered behind divider
Soap pump behind Left curve
Disposal button behind Left sink
Pullup power strip behind Right curve

Url
Tag
Img
Thumb

Sink-Layout.jpg | Hits: 174 | Size: 51.33 KB | Posted on: 6/11/16 | Link to this image


Granite layout: faucet should be centered withOUT base plate; soap pump should be behind the Left corner

Url
Tag
Img
Thumb

KitchFauct-Brizo433-Amzn1.jpg | Hits: 151 | Size: 43.1 KB | Posted on: 6/11/16 | Link to this image


Kitchen faucet Brizo 63255LF-SS Vuelo (no base plate) Bought

Url
Tag
Img
Thumb

Granite-CosmicBk3-NS.jpg | Hits: 125 | Size: 77.85 KB | Posted on: 8/27/16 | Link to this image


Kitchen granite Cosmic Black

Url
Tag
Img
Thumb

KitchCab-KraftMaidCherry-Lowes.jpg | Hits: 149 | Size: 57.21 KB | Posted on: 6/11/16 | Link to this image


Kitchen cabinets will be cherry slabs with brushed arc pulls

Url
Tag
Img
Thumb

KitchCab-MlbrnCherrz-MiniMax.jpg | Hits: 145 | Size: 42.77 KB | Posted on: 6/11/16 | Link to this image


Kitchen cabinets will be cherry slabs with brushed arc pulls

Url
Tag
Img
Thumb

Pull4-3-Lowes.jpg | Hits: 144 | Size: 52.12 KB | Posted on: 8/27/16 | Link to this image


Pulls will be 4" Brushed Nickel Arcs throughout the house

Url
Tag
Img
Thumb

Faucet-43Laundry-Amzn.jpg | Hits: 157 | Size: 66.17 KB | Posted on: 8/27/16 | Link to this image


Laundry & utility sinks' faucet is a no-brand pull-out mid-rise; bought 2.

Url
Tag
Img
Thumb

Stool-200-Scan.jpg | Hits: 144 | Size: 81.14 KB | Posted on: 8/27/16 | Link to this image


Possible kitchen stools: Amisco bar-height with Dayglam finish on the steel frame & Stratus upholstery.

Url
Tag
Img
Thumb

MWh-GE-CenWoodA.jpg | Hits: 172 | Size: 45.54 KB | Posted on: 6/11/16 | Link to this image


Microwave GE PSA9240SSFS; bought
Slide-in stove GE PS920SSFS; bought
Refrigerator GE PFE28RSHSS; bought
Diswasher GE PDT750SSFSS; bought
Washer GE GTW680BSJWS; bought
Dryer GE GTD45EASJWS; bought

Url
Tag
Img
Thumb

USBOutlet-20-Sams.jpg | Hits: 190 | Size: 64.08 KB | Posted on: 6/11/16 | Link to this image


USB outlets will be provided in most rooms, though NOT this style; bought 8

Url
Tag
Img
Thumb

Light-149Layla3-Lowes.jpg | Hits: 186 | Size: 18.89 KB | Posted on: 6/19/16 | Link to this image


Entry light will be Layla 3; bought

Url
Tag
Img
Thumb

Light-280Layla9-Lowes.jpg | Hits: 187 | Size: 7.23 KB | Posted on: 6/11/16 | Link to this image


Dining room light Layla 9; bought

Url
Tag
Img
Thumb

Light-284VaxHel-Amzn.jpg | Hits: 197 | Size: 9.22 KB | Posted on: 6/11/16 | Link to this image


Kitchen island light Vaxcel Helsinki 4 pendant; bought

Url
Tag
Img
Thumb

Light-101VaxHel3-GoingLtg.jpg | Hits: 213 | Size: 13.1 KB | Posted on: 6/11/16 | Link to this image


Bathroom vanity lights Vaxcel Helsinki 3 sconce; Bought 5

Url
Tag
Img
Thumb

Light-99Portfolio4-Lowes.jpg | Hits: 195 | Size: 9.67 KB | Posted on: 6/19/16 | Link to this image


Possibly for laundry & other

Url
Tag
Img
Thumb

Light-34Galaxy12-Lowes.jpg | Hits: 174 | Size: 11.89 KB | Posted on: 6/19/16 | Link to this image


Possibly for vaulted ceiling & other

Url
Tag
Img
Thumb

Light-39BrushedLED-Lowes.jpg | Hits: 181 | Size: 61.5 KB | Posted on: 6/11/16 | Link to this image


Surface LEDs look like recessed lights for kitchen, fireplace, & rear wall; bought 1 pair; need 4 more pairs

Url
Tag
Img
Thumb

Light-150-HD2.jpg | Hits: 173 | Size: 53.64 KB | Posted on: 6/11/16 | Link to this image


Possibly for laundry & others

Url
Tag
Img
Thumb

LightUtil-36LED-Sams.jpg | Hits: 181 | Size: 71.87 KB | Posted on: 6/11/16 | Link to this image


Possibly for attic & others; bought 1

Url
Tag
Img
Thumb

Tstat-Hnywl130-Marrs.jpg | Hits: 172 | Size: 63.88 KB | Posted on: 6/19/16 | Link to this image


Bought

Url
Tag
Img
Thumb

Wall.jpg | Hits: 157 | Size: 75.26 KB | Posted on: 6/11/16 | Link to this image


The master patio retaining wall should look something like this one near Clayton Bank.

Url
Tag
Img
Thumb

Cntnr01.jpg | Hits: 307 | Size: 103.54 KB | Posted on: 1/30/15 | Link to this image


The weather has been reasonably dry for a few days now, so I called a container company & ordered a 40' single-end.

Url
Tag
Img
Thumb

Cntnr03.jpg | Hits: 558 | Size: 114.15 KB | Posted on: 1/30/15 | Link to this image


The weather has been reasonably dry for a few days now, so I called a container company & ordered a 40' single-end. The driver had a little trouble making the turn to get off the pavement, but once he was on the grass, he had no trouble.

Url
Tag
Img
Thumb

Cntnr07.jpg | Hits: 260 | Size: 88.67 KB | Posted on: 1/30/15 | Link to this image


The weather has been reasonably dry for a few days now, so I called a container company & ordered a 40' single-end. It's now tucked out of sight, but where my neighbors can see the doors. My next investments will be padlocks, and a ladder to attach to the inside of the door.

Url
Tag
Img
Thumb

Brushpile10.JPG | Hits: 299 | Size: 179.15 KB | Posted on: 2/10/15 | Link to this image


I started collecting some of the brush I've cut, and moving it to a clearing to burn later.

Url
Tag
Img
Thumb

Brushpile11.JPG | Hits: 304 | Size: 157.62 KB | Posted on: 2/10/15 | Link to this image


I started collecting some of the brush I've cut, and moving it to a clearing to burn later.

Url
Tag
Img
Thumb

Stump2q.JPG | Hits: 168 | Size: 136 KB | Posted on: 5/2/16 | Link to this image


Several stumps had to be pulled out.

Url
Tag
Img
Thumb

Topple13.JPG | Hits: 149 | Size: 169.17 KB | Posted on: 5/2/16 | Link to this image


Several dead trees came down.

Url
Tag
Img
Thumb

Clearing01.jpg | Hits: 167 | Size: 129.87 KB | Posted on: 5/2/16 | Link to this image


The road crew brought in some equipment June 19 to start clearing the next day.

Url
Tag
Img
Thumb

Clearing06.jpg | Hits: 189 | Size: 139.95 KB | Posted on: 5/2/16 | Link to this image


Pace made much faster progress June 20 than I had been doing.

Url
Tag
Img
Thumb

Clearing08.jpg | Hits: 175 | Size: 138.51 KB | Posted on: 5/2/16 | Link to this image


Pace made much faster progress than I had been doing.

Url
Tag
Img
Thumb

Clearing15.jpg | Hits: 152 | Size: 121.28 KB | Posted on: 5/2/16 | Link to this image


It didn't take long for them to widen my trails into a road by June 23.

Url
Tag
Img
Thumb

Clearing32.jpg | Hits: 168 | Size: 118.53 KB | Posted on: 5/2/16 | Link to this image


This is the clearing for the house on June 24.

Url
Tag
Img
Thumb

Clearing38.JPG | Hits: 172 | Size: 112.89 KB | Posted on: 5/2/16 | Link to this image


The burn pile is getting big...

Url
Tag
Img
Thumb

Driveway12.jpg | Hits: 142 | Size: 98.75 KB | Posted on: 5/2/16 | Link to this image


After the road bed was cleared, a trench was dug June 30 for the underground power & gas.

Url
Tag
Img
Thumb

Driveway20.JPG | Hits: 144 | Size: 131.89 KB | Posted on: 5/2/16 | Link to this image


Skelton Electric & Somerville Gas arrived July 1.

Url
Tag
Img
Thumb

Driveway28.JPG | Hits: 169 | Size: 123.71 KB | Posted on: 5/2/16 | Link to this image


When the electrician & gas company left July 1, the trench was packed by a radio-controlled roller, and then grading began.

Url
Tag
Img
Thumb

eCulvert0.jpg | Hits: 148 | Size: 100.84 KB | Posted on: 5/2/16 | Link to this image


After the road bed was filled & graded July 9, we cut in the culverts.

Url
Tag
Img
Thumb

eCulverts9.jpg | Hits: 133 | Size: 109.06 KB | Posted on: 5/2/16 | Link to this image


Header walls were poured August 14 to protect the driveway entrance and anchor that culvert.

Url
Tag
Img
Thumb

Gravel01.jpg | Hits: 200 | Size: 123.82 KB | Posted on: 5/2/16 | Link to this image


The driveway surface during construction will be chert rock, which was brought in August 26 from a quarry at the Tennessee River.

Url
Tag
Img
Thumb

Gravel02.jpg | Hits: 192 | Size: 122.69 KB | Posted on: 5/2/16 | Link to this image


The driveway surface during construction will be chert rock, which was brought in August 26 from a quarry at the Tennessee River.

Url
Tag
Img
Thumb

MowingRocks.jpg | Hits: 230 | Size: 110.34 KB | Posted on: 11/7/15 | Link to this image


Gotta keep the gravel from growing too high.

Url
Tag
Img
Thumb

HeaderNumbert.JPG | Hits: 148 | Size: 97.46 KB | Posted on: 5/2/16 | Link to this image


I had 2 number plates plasma-cut from 1/4" stainless steel, and hung them on the headers September 29.

Url
Tag
Img
Thumb

Rain01.JPG | Hits: 157 | Size: 99.29 KB | Posted on: 5/2/16 | Link to this image


There's some erosion where this flow meets the ditch, but it appears to be slowing down as it gets to the harder clay.

Url
Tag
Img
Thumb

Rain22b.jpg | Hits: 146 | Size: 130.6 KB | Posted on: 5/2/16 | Link to this image


This was caused by an obstruction on the other side forcing rain to flow across the driveway.

Url
Tag
Img
Thumb

Floorplan04c1.jpg | Hits: 170 | Size: 51.12 KB | Posted on: 5/12/16 | Link to this image


The last floorplan (downstairs only) in DraftSight. There were a few minor changes, but this is essentially what we're building. Turns out we didn't need a 2nd A/C, and the electrical panels ended up in the hall near the master bedroom door. The pull-down attic stairs got moved to the office, and the master toilet will have dual inswinging doors.

Click the image to supersize.

Url
Tag
Img
Thumb

IMG_20160316_133059151.jpg | Hits: 178 | Size: 116.45 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads. They started on the house March 16.

Most of the filenames from here forward will be from my phone, which uses the format "IMG_YYYYMMDD_hhmmss###.jpg".

Url
Tag
Img
Thumb

IMG_20160316_134710453.jpg | Hits: 142 | Size: 123.13 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads.

Url
Tag
Img
Thumb

IMG_20160316_145312980.jpg | Hits: 154 | Size: 123.92 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads.

Url
Tag
Img
Thumb

IMG_20160317_100600437.jpg | Hits: 140 | Size: 134.4 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads.

Url
Tag
Img
Thumb

IMG_20160317_113527853.jpg | Hits: 142 | Size: 108.44 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads.

Url
Tag
Img
Thumb

IMG_20160317_164941678.jpg | Hits: 146 | Size: 110.92 KB | Posted on: 5/2/16 | Link to this image


The Paynes are building the house & shed pads.

Url
Tag
Img
Thumb

IMG_20160324_130618391.jpg | Hits: 151 | Size: 92.75 KB | Posted on: 5/2/16 | Link to this image


The house pad survived its first heavy rain March 24 fairly well.

Url
Tag
Img
Thumb

IMG_20160316_093812151.jpg | Hits: 155 | Size: 110.63 KB | Posted on: 5/2/16 | Link to this image


The Skeltons are setting the meter base March 16.

Url
Tag
Img
Thumb

IMG_20160316_163308909.jpg | Hits: 150 | Size: 118.12 KB | Posted on: 5/2/16 | Link to this image


The Skeltons are setting the 400A 1Ph meter base, and this small 100A outdoor box which will remain permanently for any outdoor circuits I bury around the property. The house will have a 22KW standby automatic generator and a 200A panel; and the shed will have a 200A panel.

Url
Tag
Img
Thumb

IMG_20160329_142640939.jpg | Hits: 152 | Size: 125.21 KB | Posted on: 5/2/16 | Link to this image


Chickasaw brought in power on March 29-30.

Url
Tag
Img
Thumb

IMG_20160330_135705979.jpg | Hits: 177 | Size: 107.49 KB | Posted on: 5/2/16 | Link to this image


Chickasaw brought in power on March 29-30, but Somerville won't connect the gas until the house is up.


Url
Tag
Img
Thumb

IMG_20160330_135933524.jpg | Hits: 154 | Size: 118.16 KB | Posted on: 5/2/16 | Link to this image


This is the first junction box along the driveway.

Url
Tag
Img
Thumb

IMG_20160330_140010678.jpg | Hits: 145 | Size: 116.37 KB | Posted on: 5/2/16 | Link to this image


This is the second junction box along the driveway.

Url
Tag
Img
Thumb

IMG_20160330_140043372.jpg | Hits: 212 | Size: 115.6 KB | Posted on: 5/2/16 | Link to this image


The transformer is close to the meter & extra panel, between the house & shed.

Url
Tag
Img
Thumb

IMG_20160406_114200798.jpg | Hits: 163 | Size: 106.36 KB | Posted on: 5/2/16 | Link to this image


Water Well Solutions drilled about 190' near the transformer & meter April 6, and returned to set the pump ~160' a few weeks later.

Url
Tag
Img
Thumb

IMG_20160422_181149865_HDR.jpg | Hits: 145 | Size: 123.78 KB | Posted on: 5/2/16 | Link to this image


They came back April 22-23 to install the pump 160' down, the tank, & the shutoff.

Url
Tag
Img
Thumb

IMG_20160419_105456988.jpg | Hits: 141 | Size: 90.39 KB | Posted on: 5/2/16 | Link to this image


Batter boards went up April 19.

Url
Tag
Img
Thumb

IMG_20160425_111249094.jpg | Hits: 163 | Size: 107.95 KB | Posted on: 5/2/16 | Link to this image


After the engineer approved the house pad, All About Plumbing tore into it April 25.

Url
Tag
Img
Thumb

IMG_20160426_132338376.jpg | Hits: 163 | Size: 105.43 KB | Posted on: 5/2/16 | Link to this image


After the engineer approved the house pad, All About Plumbing tore into it April 25.

Url
Tag
Img
Thumb

IMG_20160428_181407464.jpg | Hits: 148 | Size: 95.48 KB | Posted on: 5/2/16 | Link to this image


The plumbing is buried, and we're waiting for several storms to blow over before concrete can be poured.

Url
Tag
Img
Thumb

IMG_20160428_134434390.jpg | Hits: 164 | Size: 123.99 KB | Posted on: 5/2/16 | Link to this image


The Paynes are working on the shed pad April 28, but storms for the next few days will postpone its completion.

Url
Tag
Img
Thumb

IMG_20160505_180715726.jpg | Hits: 136 | Size: 115.65 KB | Posted on: 5/12/16 | Link to this image


Floor electrical, reinforcing steel, & termite pretreat went down May 5.

Url
Tag
Img
Thumb

IMG_20160507_081824548.jpg | Hits: 146 | Size: 123.9 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured Sat, May 7.

Url
Tag
Img
Thumb

IMG_20160507_082214853.jpg | Hits: 169 | Size: 108.36 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured.

Url
Tag
Img
Thumb

IMG_20160507_102844141.jpg | Hits: 186 | Size: 116.74 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured.

Url
Tag
Img
Thumb

IMG_20160507_104326571.jpg | Hits: 185 | Size: 120.29 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured Sat, May 7.

Url
Tag
Img
Thumb

IMG_20160507_111615578.jpg | Hits: 170 | Size: 119 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured Sat, May 7.

Url
Tag
Img
Thumb

IMG_20160507_112753463.jpg | Hits: 196 | Size: 110.11 KB | Posted on: 5/12/16 | Link to this image


Between rain storms, the slab was poured Sat, May 7.

Url
Tag
Img
Thumb

IMG_20160509_122154502.jpg | Hits: 204 | Size: 88.42 KB | Posted on: 5/12/16 | Link to this image


May 9, the front porch, West porch, & master shower were poured.

Url
Tag
Img
Thumb

IMG_20160509_170226882.jpg | Hits: 224 | Size: 87.05 KB | Posted on: 5/12/16 | Link to this image


May 9, the front porch, West porch, & master shower were poured.

Url
Tag
Img
Thumb

IMG_20160509_170234389.jpg | Hits: 237 | Size: 94.93 KB | Posted on: 5/12/16 | Link to this image


May 9, the front porch, West porch, & master shower were poured.

Url
Tag
Img
Thumb

IMG_20160509_170410092.jpg | Hits: 216 | Size: 49.76 KB | Posted on: 5/12/16 | Link to this image


May 9, the front porch, West porch, & master shower were poured.

Url
Tag
Img
Thumb

IMG_20160511_131229948.jpg | Hits: 192 | Size: 62.15 KB | Posted on: 5/12/16 | Link to this image


Intermittent rain delayed delivery of the 1st floor lumber package.

Url
Tag
Img
Thumb

IMG_20160512_145840886_HDR.jpg | Hits: 200 | Size: 126.6 KB | Posted on: 5/21/16 | Link to this image


This is just for the first floor walls, and some floor decking for upstairs.

Url
Tag
Img
Thumb

IMG_20160512_150313018.jpg | Hits: 192 | Size: 100.6 KB | Posted on: 5/21/16 | Link to this image


We went through about 5 framers who cancelled on us for various reasons, so this sat here for over a week.

Url
Tag
Img
Thumb

IMG_20160521_115835734.jpg | Hits: 214 | Size: 110.88 KB | Posted on: 5/21/16 | Link to this image


They only worked half a day, and a lot of that was snapping lines, but they're moving...

Url
Tag
Img
Thumb

IMG_20160524_125757540.jpg | Hits: 158 | Size: 111.6 KB | Posted on: 5/24/16 | Link to this image


The framers are working a previous job today, but they got a lot done in a day & half here so far.

Url
Tag
Img
Thumb

IMG_20160524_142936082.jpg | Hits: 159 | Size: 101.31 KB | Posted on: 5/24/16 | Link to this image


The framers are working a previous job today, but they got a lot done in a day & half here so far.

Url
Tag
Img
Thumb

IMG_20160524_142942786.jpg | Hits: 151 | Size: 89.22 KB | Posted on: 5/24/16 | Link to this image


The framers are working a previous job today, but they got a lot done in a day & half here so far.

Url
Tag
Img
Thumb

IMG_20160526_165630600.jpg | Hits: 177 | Size: 97.88 KB | Posted on: 5/26/16 | Link to this image


I was surprised to find the framers (a short crew) working today.

Url
Tag
Img
Thumb

IMG_20160526_170843054.jpg | Hits: 184 | Size: 76.89 KB | Posted on: 5/26/16 | Link to this image


This is the fireplace.

Url
Tag
Img
Thumb

IMG_20160526_171044474.jpg | Hits: 193 | Size: 72.47 KB | Posted on: 5/26/16 | Link to this image


This is from Guy's room looking past the stairs (whose wall was incorrectly built full-height) toward the living/dining room.

Url
Tag
Img
Thumb

IMG_20160526_171936241.jpg | Hits: 171 | Size: 107.1 KB | Posted on: 5/26/16 | Link to this image


This is where the framers stopped today.

Url
Tag
Img
Thumb

IMG_20160526_171941057.jpg | Hits: 184 | Size: 107.59 KB | Posted on: 5/26/16 | Link to this image


This is where the framers stopped today.

Url
Tag
Img
Thumb

IMG_20160601_151109791.jpg | Hits: 167 | Size: 100.65 KB | Posted on: 6/1/16 | Link to this image


Beams & joists started going up yesterday; most of them are done today, but there are a few errors...

Url
Tag
Img
Thumb

IMG_20160601_151919462.jpg | Hits: 158 | Size: 95.84 KB | Posted on: 6/1/16 | Link to this image


The rafter & 2nd-floor lumber package was delivered a few hours ago.

Url
Tag
Img
Thumb

IMG_20160607_133340944.jpg | Hits: 156 | Size: 126.1 KB | Posted on: 6/11/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160607_133345637.jpg | Hits: 135 | Size: 127.47 KB | Posted on: 6/11/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160611_131558296.jpg | Hits: 173 | Size: 81.22 KB | Posted on: 6/11/16 | Link to this image


Great room looking SE.

Url
Tag
Img
Thumb

IMG_20160611_131618236_HDR.jpg | Hits: 147 | Size: 95.06 KB | Posted on: 6/11/16 | Link to this image


Great room looking NW.

Url
Tag
Img
Thumb

IMG_20160611_140143513.jpg | Hits: 152 | Size: 86.05 KB | Posted on: 6/11/16 | Link to this image


The front porch roof isn't right yet, but the framer will fix it Monday.

Url
Tag
Img
Thumb

IMG_20160611_140150599.jpg | Hits: 156 | Size: 94.72 KB | Posted on: 6/11/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160613_151305111.jpg | Hits: 146 | Size: 95.77 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160613_151444955.jpg | Hits: 168 | Size: 93 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160613_151640593.jpg | Hits: 133 | Size: 92.85 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160613_151833223.jpg | Hits: 132 | Size: 84.63 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160613_161530705.jpg | Hits: 119 | Size: 82.84 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160614_165157730.jpg | Hits: 156 | Size: 80.51 KB | Posted on: 6/19/16 | Link to this image


This was the 2nd attempt at the stairs - it turned out wrong, too.

Url
Tag
Img
Thumb

IMG_20160617_122459839.jpg | Hits: 175 | Size: 82.91 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160617_122532469.jpg | Hits: 195 | Size: 84.19 KB | Posted on: 6/19/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160617_122609224.jpg | Hits: 171 | Size: 67.4 KB | Posted on: 6/19/16 | Link to this image


This door was set wrong, and the casing was broken when removed to correct the problem, so another casing is on-order.

Url
Tag
Img
Thumb

IMG_20160621_151342874.jpg | Hits: 157 | Size: 65.07 KB | Posted on: 6/22/16 | Link to this image


The front door showed up a couple of weeks late, but in good condition.

Url
Tag
Img
Thumb

IMG_20160621_151505490.jpg | Hits: 171 | Size: 81.25 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160621_151522796.jpg | Hits: 164 | Size: 78.21 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160621_151636629_HDR.jpg | Hits: 187 | Size: 64.8 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160621_151644815.jpg | Hits: 175 | Size: 56.53 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160621_151652382.jpg | Hits: 213 | Size: 79.82 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160621_151703808.jpg | Hits: 195 | Size: 73.09 KB | Posted on: 6/22/16 | Link to this image


I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their mistakes.

Url
Tag
Img
Thumb

IMG_20160627_155102655.jpg | Hits: 157 | Size: 67.91 KB | Posted on: 7/14/16 | Link to this image


This storm took down some branches on my property, but it laid a tree across McFadden and a few others around Oakland.

Url
Tag
Img
Thumb

IMG_20160627_155244185.jpg | Hits: 162 | Size: 66.6 KB | Posted on: 7/14/16 | Link to this image


Most of the felt stayed on the house, but it still got very wet inside.

Url
Tag
Img
Thumb

IMG_20160630_122954105.jpg | Hits: 159 | Size: 63.69 KB | Posted on: 7/14/16 | Link to this image


The ducts were delivered, and installation started a day or so later.

Url
Tag
Img
Thumb

IMG_20160705_165235537.jpg | Hits: 137 | Size: 85.32 KB | Posted on: 7/14/16 | Link to this image


I built this steel column for the NW porch, and welded wires on for the stones that will surround it later. There are three 1/2" anchors at the bottom, and 7 big wood screws at the top.

Url
Tag
Img
Thumb

IMG_20160709_162149114_HDR.jpg | Hits: 158 | Size: 98.57 KB | Posted on: 7/14/16 | Link to this image


These are the main water connections inside the wall between the master bathroom & Lisa's closet. The shutoff will be turned around.


Url
Tag
Img
Thumb

IMG_20160712_141459591.jpg | Hits: 163 | Size: 103.55 KB | Posted on: 7/14/16 | Link to this image


Shingles going up...

Url
Tag
Img
Thumb

IMG_20160712_161110837.jpg | Hits: 160 | Size: 101.66 KB | Posted on: 7/14/16 | Link to this image


I really wanted a metal roof, but it just didn't happen.

Url
Tag
Img
Thumb

IMG_20160713_161332524.jpg | Hits: 144 | Size: 76.82 KB | Posted on: 7/14/16 | Link to this image


The framer fixing another mistake...

Url
Tag
Img
Thumb

IMG_20160713_162830601_HDR.jpg | Hits: 153 | Size: 61.94 KB | Posted on: 7/14/16 | Link to this image


Chimney chase going in. The contractor & I had to help because the framer only brought 1 helper & no ladder.

Url
Tag
Img
Thumb

IMG_20160713_181805406.jpg | Hits: 148 | Size: 106.21 KB | Posted on: 7/14/16 | Link to this image


After a lot of discussion, this was eventually built the way the plans show. When it was finished, the framer did a quick dance on top of it.

Url
Tag
Img
Thumb

IMG_20160714_103016959.jpg | Hits: 153 | Size: 98.04 KB | Posted on: 7/14/16 | Link to this image


Drainage pattern looking out the master bedroom sliding door.

Url
Tag
Img
Thumb

IMG_20160714_182709160.jpg | Hits: 169 | Size: 67.95 KB | Posted on: 7/14/16 | Link to this image


I cleaned after the electricians' first day of work, but it didn't last.

Url
Tag
Img
Thumb

IMG_20160714_182817252.jpg | Hits: 143 | Size: 67.06 KB | Posted on: 7/14/16 | Link to this image


Upstairs bathroom wiring, plumbing, & ducts.

Url
Tag
Img
Thumb

IMG_20160714_182916901.jpg | Hits: 169 | Size: 80.56 KB | Posted on: 7/14/16 | Link to this image


Ducts above the living room along the SW wall above the big sliding door.

Url
Tag
Img
Thumb

IMG_20160714_182948781.jpg | Hits: 197 | Size: 76.08 KB | Posted on: 7/14/16 | Link to this image


Water heater above the master bathroom eventually got the correct vent in the correct location.

Url
Tag
Img
Thumb

IMG_20160714_183050302.jpg | Hits: 192 | Size: 73.9 KB | Posted on: 7/14/16 | Link to this image


2nd attic looking W.

Url
Tag
Img
Thumb

IMG_20160714_183157024.jpg | Hits: 187 | Size: 73.46 KB | Posted on: 7/14/16 | Link to this image


Looking E from bedroom 3 out through the garage.

Url
Tag
Img
Thumb

IMG_20160714_183240255.jpg | Hits: 172 | Size: 64.09 KB | Posted on: 7/14/16 | Link to this image


Looking E from the utility porch out through the garage.

Url
Tag
Img
Thumb

IMG_20160714_183305795.jpg | Hits: 166 | Size: 84.13 KB | Posted on: 7/14/16 | Link to this image


Drops, unused materials, and trash are piling up in the garage...

Url
Tag
Img
Thumb

IMG_20160714_183512558.jpg | Hits: 171 | Size: 67.68 KB | Posted on: 7/14/16 | Link to this image


Looking SE from the master toilet toward the generator porch.

Url
Tag
Img
Thumb

IMG_20160719_143539482.jpg | Hits: 155 | Size: 73.42 KB | Posted on: 7/23/16 | Link to this image


The framers used yellow pine for the garage door casing, and ran it all the way down tight to the concrete. I removed the verticals, painted them with oil-based Kilz, cut 1/2" off each, and reinstalled them.

Url
Tag
Img
Thumb

IMG_20160720_142125455.jpg | Hits: 154 | Size: 91.44 KB | Posted on: 7/23/16 | Link to this image


Because of all the circuits, and the generator, we had to have 2 panels. The smaller one is NOT on the generator, but it will only have things like the welder outlet, the stove, and the outdoor outlets.

Url
Tag
Img
Thumb

IMG_20160721_130709043.jpg | Hits: 164 | Size: 104.21 KB | Posted on: 7/23/16 | Link to this image


Bricks & stone were delivered.

Url
Tag
Img
Thumb

IMG_20160721_150039049_HDR.jpg | Hits: 179 | Size: 80.76 KB | Posted on: 7/23/16 | Link to this image


I'll paint the lintels tomorrow.

Url
Tag
Img
Thumb

IMG_20160721_150306733_HDR.jpg | Hits: 153 | Size: 99.77 KB | Posted on: 7/23/16 | Link to this image


We plan to have about 18" of stone at each corner (instead of brick quoins), and all the way around the fireplace (probably fake stone inside). The rest of the first floor siding will be brick; everything above will be vinyl (including the chimney), Aluminum (that matches the vinyl), or shingles. There will be virtually no exterior paint.

Url
Tag
Img
Thumb

IMG_20160726_125136022_HDR.jpg | Hits: 108 | Size: 105.24 KB | Posted on: 7/26/16 | Link to this image


After the tie inspection yesterday, the bricklayers started this morning.

Url
Tag
Img
Thumb

IMG_20160726_170256713.jpg | Hits: 168 | Size: 56.79 KB | Posted on: 7/26/16 | Link to this image


After the tie inspection yesterday, the bricklayers started this morning.

Url
Tag
Img
Thumb

IMG_20160727_162658447.jpg | Hits: 148 | Size: 75.28 KB | Posted on: 7/27/16 | Link to this image


We chose to have no soldiers anywhere; in the bricks or in the stones.

Url
Tag
Img
Thumb

IMG_20160803_160458340.jpg | Hits: 185 | Size: 71.52 KB | Posted on: 8/3/16 | Link to this image


After a break yesterday, brick work continued today on the North side.

Url
Tag
Img
Thumb

IMG_20160803_160603704.jpg | Hits: 156 | Size: 100.31 KB | Posted on: 8/3/16 | Link to this image


The South & SW sides' brick is done.

Url
Tag
Img
Thumb

IMG_20160803_160652183.jpg | Hits: 145 | Size: 105.38 KB | Posted on: 8/3/16 | Link to this image


The South & SW sides' brick is done.

Url
Tag
Img
Thumb

IMG_20160803_160849279.jpg | Hits: 163 | Size: 86.95 KB | Posted on: 8/3/16 | Link to this image


The master & office sides' (East of the front door) brick is done.

Url
Tag
Img
Thumb

IMG_20160803_160907766.jpg | Hits: 161 | Size: 70.93 KB | Posted on: 8/3/16 | Link to this image


But the front door, dining room, & garage brick hasn't been started yet. The front porch will be stone with a front arch & side slits.

Url
Tag
Img
Thumb

IMG_20160803_160756678.jpg | Hits: 159 | Size: 119.48 KB | Posted on: 8/3/16 | Link to this image


The well was connected to the house plumbing today, but the house wasn't pressurized yet. The inside shutoff valve has to be moved, and an inspection passed.

Url
Tag
Img
Thumb

IMG_20160808_173923284.jpg | Hits: 139 | Size: 51.69 KB | Posted on: 8/27/16 | Link to this image


Cleaning day - no one was working.

Url
Tag
Img
Thumb

IMG_20160808_173929394.jpg | Hits: 110 | Size: 52.51 KB | Posted on: 8/27/16 | Link to this image


Cleaning day - no one was working.

Url
Tag
Img
Thumb

IMG_20160808_174006485_HDR.jpg | Hits: 131 | Size: 47.07 KB | Posted on: 8/27/16 | Link to this image


Cleaning day - no one was working.

Url
Tag
Img
Thumb

IMG_20160808_174122344.jpg | Hits: 122 | Size: 59.43 KB | Posted on: 8/27/16 | Link to this image


Cleaning day - no one was working.

Url
Tag
Img
Thumb

IMG_20160810_113616861.jpg | Hits: 148 | Size: 109.31 KB | Posted on: 8/27/16 | Link to this image


Somerville Gas was connected today. They killed that big oak by cutting its roots all the way around.

Url
Tag
Img
Thumb

IMG_20160810_152047743.jpg | Hits: 136 | Size: 127.34 KB | Posted on: 8/27/16 | Link to this image


Somerville connected the gas today. It cost them 2 broken pieces of equipment, and several hours looking for the buried crossover conduit.


Url
Tag
Img
Thumb

IMG_20160810_155056777.jpg | Hits: 124 | Size: 92.75 KB | Posted on: 8/27/16 | Link to this image


Somerville Gas was connected to the meter today. I think they're waiting for the fireplace before connecting to the house.

Url
Tag
Img
Thumb

IMG_20160810_162506627_HDR.jpg | Hits: 142 | Size: 104.29 KB | Posted on: 8/27/16 | Link to this image


Stones are going up.

Url
Tag
Img
Thumb

IMG_20160813_103005790.jpg | Hits: 126 | Size: 101.88 KB | Posted on: 8/27/16 | Link to this image


Stones are going up.

Url
Tag
Img
Thumb

IMG_20160816_173238110.jpg | Hits: 135 | Size: 55.55 KB | Posted on: 8/27/16 | Link to this image


The tile man hung most of the backer board. This is downstairs.

Url
Tag
Img
Thumb

IMG_20160816_173313631.jpg | Hits: 131 | Size: 65.97 KB | Posted on: 8/27/16 | Link to this image


The tile man hung most of the backer board. This is upstairs.

Url
Tag
Img
Thumb

IMG_20160816_173451709.jpg | Hits: 137 | Size: 71.17 KB | Posted on: 8/27/16 | Link to this image


The tile man hung most of the backer board and floated the shower floor.

Url
Tag
Img
Thumb

IMG_20160817_130328397.jpg | Hits: 131 | Size: 49.05 KB | Posted on: 8/27/16 | Link to this image


The tile man sealed the backer board, and made a mess on the downstairs tub.

Url
Tag
Img
Thumb

IMG_20160817_130521363.jpg | Hits: 123 | Size: 55 KB | Posted on: 8/27/16 | Link to this image


The tile man sealed the backer board, but the tub faucet has to be changed.

Url
Tag
Img
Thumb

IMG_20160820_113305467.jpg | Hits: 136 | Size: 89.9 KB | Posted on: 8/27/16 | Link to this image


Most of the stone is finished, but the arch supports have to stay in a few more days.

Url
Tag
Img
Thumb

IMG_20160822_142519365.jpg | Hits: 131 | Size: 71.84 KB | Posted on: 8/27/16 | Link to this image


After MANY delays, the fireplace went in. It has the wrong refractory panels, though. And it can't be capped until the vinyl is on the chimney chase.

Url
Tag
Img
Thumb

IMG_20160824_244055547.jpg | Hits: 132 | Size: 77.58 KB | Posted on: 8/27/16 | Link to this image


This is the flue; stainless inner - galvanized outer.

Url
Tag
Img
Thumb

IMG_20160825_170051663.jpg | Hits: 145 | Size: 81.48 KB | Posted on: 8/27/16 | Link to this image


The vinyl guys started today, and are making fast progress.

Url
Tag
Img
Thumb

IMG_20160825_170314798_HDR.jpg | Hits: 161 | Size: 84.14 KB | Posted on: 8/27/16 | Link to this image


This can't be fully-wrapped until that temporary pole is moved.


Url
Tag
Img
Thumb

IMG_20160825_170359606.jpg | Hits: 168 | Size: 98.3 KB | Posted on: 8/27/16 | Link to this image


The first day's vinyl was mostly on the South faces.

Url
Tag
Img
Thumb

IMG_20160825_170612556_HDR.jpg | Hits: 145 | Size: 112.96 KB | Posted on: 8/27/16 | Link to this image


No vinyl on the front yet.

Url
Tag
Img
Thumb

IMG_20160825_170706871_HDR.jpg | Hits: 134 | Size: 111.26 KB | Posted on: 8/27/16 | Link to this image


The vinyl crew didn't get to this side today, but the porch overhangs can't be covered until the foam is sprayed, anyway.

Url
Tag
Img
Thumb

IMG_20160825_170826370.jpg | Hits: 149 | Size: 66.11 KB | Posted on: 8/27/16 | Link to this image


The plumber connected the fireplace today.

Url
Tag
Img
Thumb

IMG_20160825_171940340.jpg | Hits: 156 | Size: 59.51 KB | Posted on: 8/27/16 | Link to this image


The plumber moved the island pipes today

Url
Tag
Img
Thumb

IMG_20160825_172021440.jpg | Hits: 136 | Size: 53.08 KB | Posted on: 8/27/16 | Link to this image


The plumber turned the shutoff around today.

Url
Tag
Img
Thumb

IMG_20160826_140248008_HDR.jpg | Hits: 167 | Size: 106.47 KB | Posted on: 8/27/16 | Link to this image


Most of the front got vinyl on their 2nd day of work.

Url
Tag
Img
Thumb

IMG_20160826_150032352.jpg | Hits: 161 | Size: 82.92 KB | Posted on: 8/27/16 | Link to this image


No change back here.

Url
Tag
Img
Thumb

IMG_20160826_150035794.jpg | Hits: 161 | Size: 95.63 KB | Posted on: 8/27/16 | Link to this image


No change back here.

Url
Tag
Img
Thumb

IMG_20160827_195801646.jpg | Hits: 184 | Size: 74.18 KB | Posted on: 8/28/16 | Link to this image


Another branch came down today during a thunderstorm.

Url
Tag
Img
Thumb

IMG_20160828_160626976_HDR.jpg | Hits: 194 | Size: 106.81 KB | Posted on: 8/28/16 | Link to this image


I built this column last night & set it today so the vinyl crew can continue here tomorrow. It's resting on 2 concrete blocks, which are on a concrete footer. Eventually, a concrete patio will cover the blocks & lock the column base in.


Url
Tag
Img
Thumb

IMG_20160830_133038019.jpg | Hits: 174 | Size: 54.01 KB | Posted on: 8/30/16 | Link to this image


The garage walls were sheeted in preparation for foam insulation, but framing has not passed inspection yet.

Url
Tag
Img
Thumb

IMG_20160906_122401283.jpg | Hits: 153 | Size: 53.6 KB | Posted on: 9/12/16 | Link to this image


1,000gal septic tank going in the ground.

Url
Tag
Img
Thumb

IMG_20160906_130730468.jpg | Hits: 124 | Size: 111.48 KB | Posted on: 9/12/16 | Link to this image


1,000gal septic tank going in the ground.

Url
Tag
Img
Thumb

IMG_20160906_151024757.jpg | Hits: 164 | Size: 111.91 KB | Posted on: 9/12/16 | Link to this image


Too much gravel (R of the tree) was delivered for the curtain drain.

Url
Tag
Img
Thumb

IMG_20160906_151109193.jpg | Hits: 161 | Size: 137.08 KB | Posted on: 9/12/16 | Link to this image


After blowing a hydraulic hose, the backhoe is back to work on the leach field.

Url
Tag
Img
Thumb

IMG_20160907_173708997.jpg | Hits: 163 | Size: 107.18 KB | Posted on: 9/12/16 | Link to this image


The West half of the curtain drain.

Url
Tag
Img
Thumb

IMG_20160907_173727168_HDR.jpg | Hits: 160 | Size: 126.41 KB | Posted on: 9/12/16 | Link to this image


The North half of the curtain drain.

Url
Tag
Img
Thumb

IMG_20160907_173757199.jpg | Hits: 117 | Size: 126.49 KB | Posted on: 9/12/16 | Link to this image


2nd terrace of the leach field.

Url
Tag
Img
Thumb

IMG_20160908_122058226.jpg | Hits: 139 | Size: 130.65 KB | Posted on: 9/12/16 | Link to this image


There are 500' of leach field.

Url
Tag
Img
Thumb

IMG_20160908_135748703_HDR.jpg | Hits: 155 | Size: 121.13 KB | Posted on: 9/12/16 | Link to this image


There are 500' of leach field.

Url
Tag
Img
Thumb

IMG_20160908_135814563_HDR.jpg | Hits: 132 | Size: 101.61 KB | Posted on: 9/12/16 | Link to this image


The excess gravel has been removed, and some of the excavation has been smoothed.

Url
Tag
Img
Thumb

IMG_20160908_154148171.jpg | Hits: 159 | Size: 119.71 KB | Posted on: 9/12/16 | Link to this image


The leach field has been smoothed.

Url
Tag
Img
Thumb

IMG_20160910_145933798.jpg | Hits: 149 | Size: 99.81 KB | Posted on: 9/12/16 | Link to this image


After filling the septic tank and watering the dirt pile above it for a couple of days, some sinkholes appeared due to settling.

Url
Tag
Img
Thumb

IMG_20160909_145728989_HDR.jpg | Hits: 143 | Size: 97.7 KB | Posted on: 9/12/16 | Link to this image


Foaming began Friday, with the porch overhangs and then the 2nd attic rafters.

Url
Tag
Img
Thumb

IMG_20160910_143353615.jpg | Hits: 132 | Size: 60.56 KB | Posted on: 9/12/16 | Link to this image


Saturday, the rafters over the great room & master suite got foamed.

Url
Tag
Img
Thumb

IMG_20160910_143414567.jpg | Hits: 184 | Size: 60.05 KB | Posted on: 9/12/16 | Link to this image


Saturday, the rafters over the great room & master suite got foamed.

Url
Tag
Img
Thumb

IMG_20160910_160455851.jpg | Hits: 138 | Size: 65.59 KB | Posted on: 9/12/16 | Link to this image


Saturday, some of the guest wing's walls got foamed.

Url
Tag
Img
Thumb

IMG_20160912_144528629_HDR.jpg | Hits: 114 | Size: 101.76 KB | Posted on: 9/12/16 | Link to this image


The rest of the house was foamed Monday.

Url
Tag
Img
Thumb

IMG_20160912_144703520.jpg | Hits: 119 | Size: 89.53 KB | Posted on: 9/12/16 | Link to this image


The rest of the house was foamed Monday.

Url
Tag
Img
Thumb

IMG_20160912_180808118_HDR.jpg | Hits: 138 | Size: 87.05 KB | Posted on: 9/12/16 | Link to this image


The rest of the house was foamed Monday.

Url
Tag
Img
Thumb

IMG_20160912_181002096.jpg | Hits: 155 | Size: 60.28 KB | Posted on: 9/12/16 | Link to this image


After the foam crew picked up their trimmings & trash, I cleaned the house again with the leaf blower.

Url
Tag
Img
Thumb

IMG_20160912_181027917.jpg | Hits: 128 | Size: 75.36 KB | Posted on: 9/12/16 | Link to this image


After the foam crew picked up their trimmings & trash, I cleaned the house again with the leaf blower.

Url
Tag
Img
Thumb

IMG_20160913_152052866_HDR.jpg | Hits: 139 | Size: 91.76 KB | Posted on: 9/19/16 | Link to this image


The fireplace installer capped the chimney either the 12th or 13th.

Url
Tag
Img
Thumb

IMG_20160913_152415159_HDR.jpg | Hits: 125 | Size: 108.51 KB | Posted on: 9/19/16 | Link to this image


The electricians hung the outside boxes on the 13th.

Url
Tag
Img
Thumb

IMG_20160914_125404350_HDR.jpg | Hits: 134 | Size: 120.91 KB | Posted on: 9/19/16 | Link to this image


On the 14th, the ditch was dug and the electricians connected the panels to the meter, but the house isn't powered yet.

Url
Tag
Img
Thumb

IMG_20160914_131409283.jpg | Hits: 106 | Size: 91.78 KB | Posted on: 9/19/16 | Link to this image


On the 14th, the ditch was dug and the electricians connected the panels to the meter, but the house isn't powered yet.

Url
Tag
Img
Thumb

IMG_20160914_164844852.jpg | Hits: 136 | Size: 75.84 KB | Posted on: 9/19/16 | Link to this image


The interior walls on the master wing were insulated for sound-deadening, but none on the guest wing. Since it was so effective & cheap, I decided to do the guest walls myself.

Url
Tag
Img
Thumb

IMG_20160914_173657716.jpg | Hits: 141 | Size: 51.16 KB | Posted on: 9/19/16 | Link to this image


This is the first time since the framers started that the garage has been clean.

Url
Tag
Img
Thumb

IMG_20160915_131500390.jpg | Hits: 126 | Size: 80.62 KB | Posted on: 9/19/16 | Link to this image


The vinyl crew finished the overhangs.

Url
Tag
Img
Thumb

IMG_20160915_131614541_HDR.jpg | Hits: 140 | Size: 82.16 KB | Posted on: 9/19/16 | Link to this image


The vinyl crew finished the overhangs.

Url
Tag
Img
Thumb

IMG_20160915_131638366.jpg | Hits: 137 | Size: 53.21 KB | Posted on: 9/19/16 | Link to this image


The vinyl crew finished the overhangs.

Url
Tag
Img
Thumb

IMG_20160915_131648214.jpg | Hits: 110 | Size: 106.3 KB | Posted on: 9/19/16 | Link to this image


The ditch man backfilled the electrical surprisingly-well; there was almost no settling even after soaking it & driving the Bronco along it.

Url
Tag
Img
Thumb

IMG_20160915_122624432.jpg | Hits: 123 | Size: 59.78 KB | Posted on: 9/19/16 | Link to this image


The sheetrock & materials were delivered on the 15th, but none was hung.

Url
Tag
Img
Thumb

IMG_20160915_122840084.jpg | Hits: 143 | Size: 68.52 KB | Posted on: 9/19/16 | Link to this image


The sheetrock & materials were delivered on the 15th, but none was hung.

Url
Tag
Img
Thumb

IMG_20160916_150232491.jpg | Hits: 141 | Size: 47.28 KB | Posted on: 9/19/16 | Link to this image


They got about half the house done on the 16th.

Url
Tag
Img
Thumb

IMG_20160916_150720794.jpg | Hits: 138 | Size: 43.83 KB | Posted on: 9/19/16 | Link to this image


They got about half the house done on the 16th. I expected that seam at the top of the vaulted stairwell ceiling to be a problem, but it's straight.

Url
Tag
Img
Thumb

IMG_20160916_150859364.jpg | Hits: 147 | Size: 30.98 KB | Posted on: 9/19/16 | Link to this image


They got about half the house done on the 16th.

Url
Tag
Img
Thumb

IMG_20160916_151325985.jpg | Hits: 134 | Size: 42.64 KB | Posted on: 9/19/16 | Link to this image


The framer crowned one celing joist down, and the sheetrock boss told the crew to sheet it for some reason. So now, it's coming down so the framer can fix it.

Url
Tag
Img
Thumb

IMG_20160919_113802403.jpg | Hits: 137 | Size: 42.58 KB | Posted on: 9/19/16 | Link to this image


The rest of the house was sheeted Saturday (this is the kitchen), but one spot was covered that shouldn't be. And the electricians forgot to connect the fireplace, so a little more had to come down.

Url
Tag
Img
Thumb

IMG_20160919_113858538.jpg | Hits: 186 | Size: 48.49 KB | Posted on: 9/19/16 | Link to this image


The rest of the house was sheeted Saturday, but one spot was covered that shouldn't be. And the electricians forgot to connect the fireplace, so a little more had to come down.

Url
Tag
Img
Thumb

IMG_20160919_113920317.jpg | Hits: 118 | Size: 43.56 KB | Posted on: 9/19/16 | Link to this image


The rest of the house was sheeted Saturday, but one spot was covered that shouldn't be. And the electricians forgot to connect the fireplace, so a little more had to come down.

Url
Tag
Img
Thumb

IMG_20160920_164813429.jpg | Hits: 151 | Size: 45.76 KB | Posted on: 10/1/16 | Link to this image


The framers fixed the joist so the ceiling is flat.

Url
Tag
Img
Thumb

IMG_20160920_165026238.jpg | Hits: 139 | Size: 30.94 KB | Posted on: 10/1/16 | Link to this image


This backer board is too high under the outlets, so it needs to be cut for more drywall.

Url
Tag
Img
Thumb

IMG_20160922_180038021.jpg | Hits: 109 | Size: 95.51 KB | Posted on: 10/1/16 | Link to this image


The masonry contractor was cleaning up and ripped out a window ledge, damage some Aluminum trim, and broke my hose splitter.

Url
Tag
Img
Thumb

IMG_20160923_103947374.jpg | Hits: 138 | Size: 112.31 KB | Posted on: 10/1/16 | Link to this image


After cleaning up the drywall debris that had been thrown out & piled in the garage, the forming crew got to work.

Url
Tag
Img
Thumb

IMG_20160923_141903633.jpg | Hits: 136 | Size: 98.92 KB | Posted on: 10/1/16 | Link to this image


Master patio

The form runs too far on the left.

Url
Tag
Img
Thumb

IMG_20160923_143216503.jpg | Hits: 132 | Size: 96.99 KB | Posted on: 10/1/16 | Link to this image


Driveway

Url
Tag
Img
Thumb

IMG_20160924_091950338.jpg | Hits: 99 | Size: 101.37 KB | Posted on: 10/1/16 | Link to this image


This is a conduit for wiring or irrigation in front of the front porch.

Url
Tag
Img
Thumb

IMG_20160924_100108651_HDR.jpg | Hits: 135 | Size: 117.25 KB | Posted on: 10/1/16 | Link to this image


The first truck did about half the driveway.

The green pipes are for the gutter downspouts.

Url
Tag
Img
Thumb

IMG_20160924_103938422_HDR.jpg | Hits: 119 | Size: 111.1 KB | Posted on: 10/1/16 | Link to this image


The second truck finished the driveway, but not the parking pad beside the garage.

Url
Tag
Img
Thumb

IMG_20160924_111807757.jpg | Hits: 127 | Size: 86.69 KB | Posted on: 10/1/16 | Link to this image


Control joints going in during finishing.

Url
Tag
Img
Thumb

IMG_20160925_184029412.jpg | Hits: 137 | Size: 94.56 KB | Posted on: 10/1/16 | Link to this image


I'll probably keep the barriers up for a week to let this really cure.

Url
Tag
Img
Thumb

IMG_20160926_104545262.jpg | Hits: 119 | Size: 96.64 KB | Posted on: 10/1/16 | Link to this image


Back patio forms going up.

The green pipes are for the gutter downspouts. Only a few joints are glued at this point - the pipes have to come out for the cement truck to get to the far end.

Url
Tag
Img
Thumb

IMG_20160926_112532220.jpg | Hits: 137 | Size: 29.87 KB | Posted on: 10/1/16 | Link to this image


While waiting for a truck, the concrete crew worked on a lump they left in the house slab. I expected them to grind it down, but they used sledge hammers & a drill.

Url
Tag
Img
Thumb

IMG_20160926_130659458.jpg | Hits: 132 | Size: 95.92 KB | Posted on: 10/1/16 | Link to this image


While concrete was being poured outside, the drywall was being sanded inside. Sometimes it looked like the house was on fire.

Url
Tag
Img
Thumb

IMG_20160926_130930216.jpg | Hits: 137 | Size: 98.34 KB | Posted on: 10/1/16 | Link to this image


Master patio coming up to grade.

Url
Tag
Img
Thumb

IMG_20160926_170027015_HDR.jpg | Hits: 108 | Size: 60.09 KB | Posted on: 10/1/16 | Link to this image


I didn't see when the doors & trim were delivered, but there was one with the wrong hinges, and another was damaged.

Url
Tag
Img
Thumb

IMG_20160926_170031234.jpg | Hits: 114 | Size: 62.65 KB | Posted on: 10/1/16 | Link to this image


I didn't see when the doors & trim were delivered.

Url
Tag
Img
Thumb

IMG_20160927_103103743.jpg | Hits: 115 | Size: 112.04 KB | Posted on: 10/1/16 | Link to this image


The back patio is going down. They're almost to the point of putting the downspout pipes back in.

Url
Tag
Img
Thumb

IMG_20160927_103626605_HDR.jpg | Hits: 104 | Size: 108.47 KB | Posted on: 10/1/16 | Link to this image


The extra parking pad is poured.

Url
Tag
Img
Thumb

IMG_20160927_113532697.jpg | Hits: 142 | Size: 95.21 KB | Posted on: 10/1/16 | Link to this image


One more truck with ~8yds is on the way to finish the master patio & sidewalk.

Url
Tag
Img
Thumb

IMG_20160927_124629790_HDR.jpg | Hits: 114 | Size: 120.65 KB | Posted on: 10/1/16 | Link to this image


Master patio going down.

Url
Tag
Img
Thumb

IMG_20160930_174928486.jpg | Hits: 113 | Size: 74.09 KB | Posted on: 10/1/16 | Link to this image


I'm wetting all the concrete down about every other day, and it's hard to keep it all wet because it drains so well.

Url
Tag
Img
Thumb

IMG_20160930_175040043.jpg | Hits: 156 | Size: 45.89 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

The backer board is low enough now for the tile not to interfere with the outlets.

Url
Tag
Img
Thumb

IMG_20160930_175139073.jpg | Hits: 121 | Size: 46.31 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

Url
Tag
Img
Thumb

IMG_20160930_175200726.jpg | Hits: 126 | Size: 49.96 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

The rough area used to be a lump - now it's low enough for the tile man to float across it.

Url
Tag
Img
Thumb

IMG_20160930_175327372.jpg | Hits: 154 | Size: 58.49 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

I moved all the doors around to clean under them, but I didn't feel like moving all this trim. I just blasted it thoroughly with the leaf blower.

Url
Tag
Img
Thumb

IMG_20160930_175342519_HDR.jpg | Hits: 113 | Size: 73.78 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

I moved all the doors around to clean under them, but I didn't feel like moving all this trim. I just blasted it thoroughly with the leaf blower.

Url
Tag
Img
Thumb

IMG_20160930_175433621.jpg | Hits: 120 | Size: 50.78 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out. The trash can was almost too heavy for me to lift into the dumpster.

Url
Tag
Img
Thumb

IMG_20160930_175731873.jpg | Hits: 134 | Size: 39.58 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes. The trash can was almost too heavy for me to lift into the dumpster.

Url
Tag
Img
Thumb

IMG_20160930_175808038.jpg | Hits: 122 | Size: 39.97 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out.

Url
Tag
Img
Thumb

IMG_20160930_175813635.jpg | Hits: 127 | Size: 35.97 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out.

I'm not sure if that bulge in the drywall is going to stay.

Url
Tag
Img
Thumb

IMG_20160930_175933344.jpg | Hits: 120 | Size: 39.33 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes.

Url
Tag
Img
Thumb

IMG_20160930_180123807.jpg | Hits: 127 | Size: 39.61 KB | Posted on: 10/1/16 | Link to this image


I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes.

Url
Tag
Img
Thumb

IMG_20160930_180255867.jpg | Hits: 175 | Size: 52.5 KB | Posted on: 10/1/16 | Link to this image


All the dust interferes with the flash & focus.

Url
Tag
Img
Thumb

IMG_20160930_180349771.jpg | Hits: 156 | Size: 70.87 KB | Posted on: 10/1/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20160930_190204975.jpg | Hits: 149 | Size: 66.49 KB | Posted on: 10/1/16 | Link to this image


Master & back patios

AKA the helipad

Url
Tag
Img
Thumb

IMG_20160930_190255074.jpg | Hits: 163 | Size: 55.53 KB | Posted on: 10/1/16 | Link to this image


Back patio

Url
Tag
Img
Thumb

IMG_20160930_190437665.jpg | Hits: 153 | Size: 52.11 KB | Posted on: 10/1/16 | Link to this image


Driveway & parking pad

Url
Tag
Img
Thumb

IMG_20161001_134202988.jpg | Hits: 124 | Size: 85.49 KB | Posted on: 10/1/16 | Link to this image


The 2nd column is taking a lot longer than the replacement mason expected - he'll have to come back to finish.

Url
Tag
Img
Thumb

IMG_20161002_121706179.jpg | Hits: 165 | Size: 87.12 KB | Posted on: 10/2/16 | Link to this image


He came back Sunday to finish the column & window ledge.

Url
Tag
Img
Thumb

IMG_20161002_121911319.jpg | Hits: 151 | Size: 89.13 KB | Posted on: 10/2/16 | Link to this image


He came back Sunday to finish the column & window ledge.

Url
Tag
Img
Thumb

IMG_20161002_123454285.jpg | Hits: 137 | Size: 82.42 KB | Posted on: 10/2/16 | Link to this image


He fixed this major damage, but left all the little errors for the masons who made them.

Url
Tag
Img
Thumb

IMG_20161011_145551572.jpg | Hits: 161 | Size: 51.42 KB | Posted on: 10/12/16 | Link to this image


Almost nothing has happened for the past 2 weeks, waiting for paint & tile. But before the tile goes down, I'm spraying around all the walls. I also blew the house out again (lots of dust from spraying the ceilings), and cleaned the garage (another near-hernia dumping the trash into the dumpster).

Url
Tag
Img
Thumb

IMG_20161012_101252159_HDR.jpg | Hits: 155 | Size: 105.23 KB | Posted on: 10/12/16 | Link to this image


Early Wednesday morning, I loaded about a ton of tile from the container to the trailer, and then moved it to the master porch for the tile guys.

Url
Tag
Img
Thumb

IMG_20161012_150307626_HDR.jpg | Hits: 159 | Size: 74.88 KB | Posted on: 10/12/16 | Link to this image


They got off to a fast start, and then seemed to slow down.

Url
Tag
Img
Thumb

IMG_20161012_162332679.jpg | Hits: 150 | Size: 37.29 KB | Posted on: 10/12/16 | Link to this image


While they worked, I scraped & swept (even where they won't be laying tile).

Url
Tag
Img
Thumb

IMG_20161012_183528889.jpg | Hits: 120 | Size: 43.3 KB | Posted on: 10/12/16 | Link to this image


Somehow, they ran out of tile for the master bathroom floor.

Url
Tag
Img
Thumb

IMG_20161012_195132253.jpg | Hits: 151 | Size: 48.42 KB | Posted on: 10/12/16 | Link to this image


They worked until almost 10PM.

Url
Tag
Img
Thumb

IMG_20161013_160545277.jpg | Hits: 110 | Size: 52.34 KB | Posted on: 10/29/16 | Link to this image


This tub's shelves are the way I said...

Url
Tag
Img
Thumb

IMG_20161014_133853406.jpg | Hits: 126 | Size: 47.29 KB | Posted on: 10/29/16 | Link to this image


These are backward - we want the high shelf near the shower, and the low shelf away.

Url
Tag
Img
Thumb

IMG_20161014_174857003.jpg | Hits: 123 | Size: 78.29 KB | Posted on: 10/29/16 | Link to this image


The master shower floor went down quickly.

Url
Tag
Img
Thumb

IMG_20161017_174735881.jpg | Hits: 140 | Size: 52.18 KB | Posted on: 10/29/16 | Link to this image


With the bulk of the floor done, the cabinets came in, but they didn't get the kick on this side of the island right.

Url
Tag
Img
Thumb

IMG_20161017_174820426.jpg | Hits: 131 | Size: 57.86 KB | Posted on: 10/29/16 | Link to this image


They almost goofed the cabinet spacing, too, but it's correct now.

Url
Tag
Img
Thumb

IMG_20161018_144345130.jpg | Hits: 117 | Size: 46.38 KB | Posted on: 10/29/16 | Link to this image


Each of the tub rooms has a tall cabinet beside the vanity.

Url
Tag
Img
Thumb

IMG_20161018_144439779.jpg | Hits: 107 | Size: 33.84 KB | Posted on: 10/29/16 | Link to this image


The downstairs toilet just has a small vanity.

Url
Tag
Img
Thumb

IMG_20161018_144543893.jpg | Hits: 120 | Size: 35.55 KB | Posted on: 10/29/16 | Link to this image


The laundry counter will be L-shaped, and level with the dryer.

Url
Tag
Img
Thumb

IMG_20161018_144624065.jpg | Hits: 108 | Size: 31.5 KB | Posted on: 10/29/16 | Link to this image


My vanity also has a tall cabinet.

Url
Tag
Img
Thumb

IMG_20161018_144638953.jpg | Hits: 140 | Size: 35.87 KB | Posted on: 10/29/16 | Link to this image


Hers has a similar tall cabinet, and knee space for makeup. We chose the same pulls that we have in the current house.

Url
Tag
Img
Thumb

IMG_20161020_151012156.jpg | Hits: 137 | Size: 28.23 KB | Posted on: 10/29/16 | Link to this image


After cabinets, trim work began. The baseboard has a simple quarter-round routed onto it, and there will be a quarter-round shoe mould.

Url
Tag
Img
Thumb

IMG_20161020_151143644.jpg | Hits: 145 | Size: 36.74 KB | Posted on: 10/29/16 | Link to this image


The baseboards wrap around the bullnose corners.

Url
Tag
Img
Thumb

IMG_20161021_150418958.jpg | Hits: 129 | Size: 48.06 KB | Posted on: 10/29/16 | Link to this image


While they were working on trim, I built the bench & painted the utility room walls.

Url
Tag
Img
Thumb

IMG_20161026_173952111.jpg | Hits: 139 | Size: 35.77 KB | Posted on: 10/29/16 | Link to this image


While they were working on trim, I built the bench & painted the utility room walls.

Url
Tag
Img
Thumb

IMG_20161026_174207164.jpg | Hits: 158 | Size: 36.49 KB | Posted on: 10/29/16 | Link to this image


When the cabinet guys left, the tile guys came back to fix the problem tiles.

Url
Tag
Img
Thumb

IMG_20161026_174449653.jpg | Hits: 123 | Size: 45.03 KB | Posted on: 10/29/16 | Link to this image


They also reversed the shelves in the upstairs tub surround.

Url
Tag
Img
Thumb

IMG_20161026_174806133.jpg | Hits: 127 | Size: 44.11 KB | Posted on: 10/29/16 | Link to this image


There were a lot of lumps in the great room.

Url
Tag
Img
Thumb

IMG_20161026_174926553.jpg | Hits: 147 | Size: 49.79 KB | Posted on: 10/29/16 | Link to this image


The trim carpenter had to tear out sheetrock, tile, & framing to fix the office closet door.

Url
Tag
Img
Thumb

IMG_20161026_175014184.jpg | Hits: 156 | Size: 36.88 KB | Posted on: 10/29/16 | Link to this image


There was a gap in the stove pocket tile...

Url
Tag
Img
Thumb

IMG_20161026_175025251.jpg | Hits: 134 | Size: 53.3 KB | Posted on: 10/29/16 | Link to this image


...and another gap under the island.

Url
Tag
Img
Thumb

IMG_20161026_175052676.jpg | Hits: 140 | Size: 40.81 KB | Posted on: 10/29/16 | Link to this image


Several more problems in the master hall.

Url
Tag
Img
Thumb

IMG_20161026_175351485_HDR.jpg | Hits: 175 | Size: 101.27 KB | Posted on: 10/29/16 | Link to this image


The electrician set the generator, other than the gas connection.

Url
Tag
Img
Thumb

IMG_20161028_125956755_HDR.jpg | Hits: 136 | Size: 60.65 KB | Posted on: 10/29/16 | Link to this image


The pantry & office closet will have similar shelves, but the office will have wire above eye-level.

Url
Tag
Img
Thumb

IMG_20161028_133556714.jpg | Hits: 147 | Size: 49.37 KB | Posted on: 10/29/16 | Link to this image


Most of the master shower surround & wainscot marble went up in a day.

Url
Tag
Img
Thumb

IMG_20161028_153421058.jpg | Hits: 184 | Size: 50.83 KB | Posted on: 10/29/16 | Link to this image


The penthouse tenants are going to be a problem. I'll have to get a long ladder to run them out one night.

Url
Tag
Img
Thumb

IMG_20161101_105210077.jpg | Hits: 174 | Size: 76.29 KB | Posted on: 11/5/16 | Link to this image


The garage is getting cluttered again, but the workshop is going up. The red iron is visible above the black pickup. IF THE IMAGE IS TOO SMALL, click it.

Url
Tag
Img
Thumb

IMG_20161101_110816421.jpg | Hits: 146 | Size: 43.8 KB | Posted on: 11/5/16 | Link to this image


The master shower marble came out the way we wanted.

Url
Tag
Img
Thumb

IMG_20161102_145035949_HDR.jpg | Hits: 141 | Size: 53.53 KB | Posted on: 11/5/16 | Link to this image


These are overdue, and we're still waiting on the other one.

Url
Tag
Img
Thumb

IMG_20161103_131746123_HDR.jpg | Hits: 132 | Size: 51.36 KB | Posted on: 11/5/16 | Link to this image


It's great to have enough doors to close the house up now. The trim carpenter is working on the stair wrap.

Url
Tag
Img
Thumb

IMG_20161103_132116099.jpg | Hits: 151 | Size: 49.18 KB | Posted on: 11/5/16 | Link to this image


The trim carpenter is moving along.

Url
Tag
Img
Thumb

IMG_20161103_162329718_HDR.jpg | Hits: 147 | Size: 105.97 KB | Posted on: 11/5/16 | Link to this image


He made a little mess on the helipad.

Url
Tag
Img
Thumb

IMG_20161103_162606799.jpg | Hits: 184 | Size: 76 KB | Posted on: 11/5/16 | Link to this image


We're still waiting on the mason to finish up the brick punch list.

Url
Tag
Img
Thumb

IMG_20161103_162617663.jpg | Hits: 157 | Size: 60.59 KB | Posted on: 11/5/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20161104_160130844_HDR.jpg | Hits: 115 | Size: 61.7 KB | Posted on: 11/5/16 | Link to this image


We're pricing stone around the fireplace, and the painters are due Saturday.

Url
Tag
Img
Thumb

IMG_20161104_160221841.jpg | Hits: 180 | Size: 50.7 KB | Posted on: 11/5/16 | Link to this image


The 2 downstairs bedrooms.

Url
Tag
Img
Thumb

IMG_20161104_160524579_HDR.jpg | Hits: 150 | Size: 80.91 KB | Posted on: 11/5/16 | Link to this image


We get a LOT of sunlight through the 96sqft patio door in the afternoons.

Url
Tag
Img
Thumb

IMG_20161104_160633474.jpg | Hits: 157 | Size: 55.43 KB | Posted on: 11/5/16 | Link to this image



Url
Tag
Img
Thumb

IMG_20161104_160802183_HDR.jpg | Hits: 137 | Size: 49.46 KB | Posted on: 11/5/16 | Link to this image


There's a lot of sunlight in the master hall, too.

Url
Tag
Img
Thumb

IMG_20161104_160855667.jpg | Hits: 138 | Size: 49.02 KB | Posted on: 11/5/16 | Link to this image


Laundry room

Url
Tag
Img
Thumb

IMG_20161104_161110798.jpg | Hits: 158 | Size: 45.06 KB | Posted on: 11/5/16 | Link to this image


Master shower

Url
Tag
Img
Thumb

IMG_20161104_161534176_HDR.jpg | Hits: 138 | Size: 76.54 KB | Posted on: 11/5/16 | Link to this image


The entry looks straight through to the main patio.

Url
Tag
Img
Thumb

IMG_20161104_161851984.jpg | Hits: 150 | Size: 31.22 KB | Posted on: 11/5/16 | Link to this image


Utility room with sink & workbench

Url
Tag
Img
Thumb

IMG_20161104_162028651.jpg | Hits: 144 | Size: 72.82 KB | Posted on: 11/5/16 | Link to this image


The helipad is clean again.

Url
Tag
Img
Thumb

IMG_20161104_180402084.jpg | Hits: 137 | Size: 82.69 KB | Posted on: 11/5/16 | Link to this image


I had to finish mowing this field with a flashlight.

Url
Tag
Img
Thumb

IMG_20161105_163802919.jpg | Hits: 107 | Size: 29.24 KB | Posted on: 11/15/16 | Link to this image


The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of door hardware, which is now ruined.

Url
Tag
Img
Thumb

IMG_20161105_163845014.jpg | Hits: 117 | Size: 39.25 KB | Posted on: 11/15/16 | Link to this image


The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of door hardware.

Url
Tag
Img
Thumb

IMG_20161105_163857016.jpg | Hits: 135 | Size: 37.95 KB | Posted on: 11/15/16 | Link to this image


The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of door hardware. They covered some things, but not all.

Url
Tag
Img
Thumb

IMG_20161105_163953843.jpg | Hits: 107 | Size: 39.38 KB | Posted on: 11/15/16 | Link to this image


The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of door hardware. They covered some things, but not this door's window.

Url
Tag
Img
Thumb

IMG_20161105_164331292.jpg | Hits: 110 | Size: 37.83 KB | Posted on: 11/15/16 | Link to this image


This outlet is required by code.

Url
Tag
Img
Thumb

IMG_20161105_164513776.jpg | Hits: 144 | Size: 32.19 KB | Posted on: 11/15/16 | Link to this image


The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of door hardware, which is now ruined.

Url
Tag
Img
Thumb

IMG_20161107_144836135.jpg | Hits: 126 | Size: 66.42 KB | Posted on: 11/15/16 | Link to this image


There's a tiny leak from one of the water heater fittings, but the catch pan is doing its job.

Url
Tag
Img
Thumb

IMG_20161107_152541534.jpg | Hits: 115 | Size: 82.4 KB | Posted on: 11/15/16 | Link to this image


The mason is acid-washing the brick, but it's going to take at least another pass to remove all the extra mortar.

Url
Tag
Img
Thumb

IMG_20161109_134300167_HDR.jpg | Hits: 113 | Size: 55.87 KB | Posted on: 11/15/16 | Link to this image


The master bath walls are now the right color.

Url
Tag
Img
Thumb

IMG_20161110_105917631.jpg | Hits: 125 | Size: 142.01 KB | Posted on: 11/15/16 | Link to this image


The shop is also going up.

Url
Tag
Img
Thumb

IMG_20161111_125508441.jpg | Hits: 154 | Size: 74.42 KB | Posted on: 11/15/16 | Link to this image


The garage door is partially installed; the caming & insulation are missing, though.

Url
Tag
Img
Thumb

IMG_20161115_144037498.jpg | Hits: 113 | Size: 26.17 KB | Posted on: 11/15/16 | Link to this image


The electricians are putting up light fixtures. These are over the kitchen island.

Url
Tag
Img
Thumb

IMG_20161115_144403078.jpg | Hits: 130 | Size: 33.6 KB | Posted on: 11/15/16 | Link to this image


Hall light fixtures.

Url
Tag
Img
Thumb

IMG_20161115_165924852.jpg | Hits: 109 | Size: 33.87 KB | Posted on: 11/15/16 | Link to this image


We're using these ceiling fans all over the house, except the office. These in the LR & the master bedroom (10' ceilings) have 12" drop rods; the rest use ~4" rods.

Url
Tag
Img
Thumb

IMG_20161115_180309050.jpg | Hits: 127 | Size: 63.15 KB | Posted on: 11/15/16 | Link to this image


Another mason is putting up the fireplace facade using fake stone.

Url
Tag
Img
Thumb

IMG_20161117_131039337.jpg | Hits: 110 | Size: 69.78 KB | Posted on: 1/7/17 | Link to this image


Other than the spatter on the fireplace, this came out just the way she wanted.

Url
Tag
Img
Thumb

IMG_20161117_131407088.jpg | Hits: 144 | Size: 36.35 KB | Posted on: 1/7/17 | Link to this image


The garage will be well-lit with 4 of these 4-foot LEDs from Sam's, and the opener's light. The front 2 are beside the door, so it doesn't block them.

Url
Tag
Img
Thumb

IMG_20161117_131453277_HDR.jpg | Hits: 105 | Size: 82.72 KB | Posted on: 1/7/17 | Link to this image


The front of the house has 3 motion-sensor LED floods, and 2 cameras.

Url
Tag
Img
Thumb

IMG_20161117_131555979.jpg | Hits: 103 | Size: 54.48 KB | Posted on: 1/7/17 | Link to this image


The garage door is insulated, and has the matching Prairie caming.

Url
Tag
Img
Thumb

IMG_20161117_131625686.jpg | Hits: 149 | Size: 78.01 KB | Posted on: 1/7/17 | Link to this image


We paid a little extra to get the door made in tan instead of painted on-site.

Url
Tag
Img
Thumb

IMG_20161122_130809120.jpg | Hits: 123 | Size: 33.09 KB | Posted on: 1/7/17 | Link to this image


The electricians couldn't put all the circuits on one panel, so the smaller one is NOT on the generator. But we put things that we can do without on it, like the big stove, the welder outlet, the outside outlets, and the dryer.

Url
Tag
Img
Thumb

IMG_20161122_154138395_HDR.jpg | Hits: 100 | Size: 74.04 KB | Posted on: 1/7/17 | Link to this image


This light is dimmable, and on a separate circuit from the others.

Url
Tag
Img
Thumb

IMG_20161122_172936164.jpg | Hits: 137 | Size: 42.22 KB | Posted on: 1/7/17 | Link to this image


The coach lights are on a separate switch from the main helipad floodlights. The far flood & the light above the covered porch (not visible) are on another switch. The floods for the master patio (out-of-frame Right) are switched in the master bedroom.

Url
Tag
Img
Thumb

IMG_20161122_173256074.jpg | Hits: 93 | Size: 29.16 KB | Posted on: 1/7/17 | Link to this image


The helipad has plenty of light for night landings.

Url
Tag
Img
Thumb

IMG_20161122_173515412.jpg | Hits: 128 | Size: 51.65 KB | Posted on: 1/7/17 | Link to this image


That's the exit motion LED above the walkway to my parking spots, and the master patio. The porch light in the arch isn't on.

Url
Tag
Img
Thumb

IMG_20161122_173534277.jpg | Hits: 145 | Size: 53.32 KB | Posted on: 1/7/17 | Link to this image


These motion lights come on for cars entering from the driveway.

Url
Tag
Img
Thumb

IMG_20161122_173601663.jpg | Hits: 108 | Size: 57.66 KB | Posted on: 1/7/17 | Link to this image


The light by the garage is motion; the other floods are switched in the utility room.

Url
Tag
Img
Thumb

IMG_20161122_173627616.jpg | Hits: 104 | Size: 76.02 KB | Posted on: 1/7/17 | Link to this image


These floods light the area around the utility porch (where the riding mower will be parked). The porch itself has a pair of 4-foot LEDs, like those in the garage.

Url
Tag
Img
Thumb

IMG_20161128_144911623.jpg | Hits: 100 | Size: 74.34 KB | Posted on: 1/7/17 | Link to this image


The concrete crew left a depression in the existing bank that allowed a torrent from the high ground to erode onto the patio. The landscapers are coming to fix it, when the ground dries out some.

Url
Tag
Img
Thumb

IMG_20161128_164842421_HDR.jpg | Hits: 95 | Size: 71 KB | Posted on: 1/7/17 | Link to this image


It's a good thing we had the huge back door (and cement leading to it) because this dolly was too tall for the island top to fit through a standard-height door.

Url
Tag
Img
Thumb

IMG_20161130_142414033.jpg | Hits: 135 | Size: 65.61 KB | Posted on: 1/7/17 | Link to this image


The fabrication shop produced the parts I designed for the banister; now, I have to finish, assemble, & install them.


Url
Tag
Img
Thumb

IMG_20161205_145820215.jpg | Hits: 92 | Size: 94.17 KB | Posted on: 1/7/17 | Link to this image


The appliances were delivered today, but the washer was damaged. Later, I found one of the racks for the stove was damaged, too. Both were replaced free.

Url
Tag
Img
Thumb

IMG_20161209_114527431_HDR.jpg | Hits: 117 | Size: 108.85 KB | Posted on: 1/7/17 | Link to this image


The landscapers surprised me, so I had to rush out & buy ~$1200 of plants this morning.

Url
Tag
Img
Thumb

IMG_20161209_130250051.jpg | Hits: 115 | Size: 82.42 KB | Posted on: 1/7/17 | Link to this image


They've done most of the grading, and now we're setting out the pots where they'll be planted.

Url
Tag
Img
Thumb

IMG_20161209_130357633.jpg | Hits: 91 | Size: 68.44 KB | Posted on: 1/7/17 | Link to this image


We spent a little extra to get a few larger plants.

Url
Tag
Img
Thumb

IMG_20161209_130419182.jpg | Hits: 108 | Size: 92.17 KB | Posted on: 1/7/17 | Link to this image


We spent a little extra to get a few larger plants.

Url
Tag
Img
Thumb

IMG_20161209_143636537.jpg | Hits: 98 | Size: 47.35 KB | Posted on: 1/7/17 | Link to this image


While the landscapers worked outside, the plumbers worked inside. The pool drain had to be moved a few inches, and its hole filled with cement.

Url
Tag
Img
Thumb

IMG_20161211_130427181.jpg | Hits: 100 | Size: 42.4 KB | Posted on: 1/7/17 | Link to this image


We had the garage floor sealed, but we skipped the sprinkles.

Url
Tag
Img
Thumb

IMG_20161212_145716656.jpg | Hits: 86 | Size: 60.7 KB | Posted on: 1/7/17 | Link to this image


With most of the drywall & paint finished, the carpet went down in 1 day. I think this was the only trade that finished in the time they said they would.

Url
Tag
Img
Thumb

IMG_20161212_145808030.jpg | Hits: 75 | Size: 43.4 KB | Posted on: 1/7/17 | Link to this image


With most of the drywall & paint finished, the carpet went down in 1 day. I think this was the only trade that finished in the time they said they would.

Url
Tag
Img
Thumb

IMG_20161213_105110994.jpg | Hits: 111 | Size: 41.1 KB | Posted on: 1/7/17 | Link to this image


With most of the drywall & paint finished, the carpet went down in 1 day. I think this was the only trade that finished in the time they said they would.

Url
Tag
Img
Thumb

IMG_20161213_145943050.jpg | Hits: 94 | Size: 56.87 KB | Posted on: 1/7/17 | Link to this image


The painters finally stained the front door, after I reminded them a few times to remove it & NOT attempt to tape up the hardware.

Url
Tag
Img
Thumb

IMG_20161216_154714632.jpg | Hits: 90 | Size: 60.19 KB | Posted on: 1/7/17 | Link to this image


The shower enclosure was installed today, but they forgot the door sweep and handle, so they have to come back next week.

Url
Tag
Img
Thumb

IMG_20161216_154741136.jpg | Hits: 120 | Size: 58.65 KB | Posted on: 1/7/17 | Link to this image


The shower enclosure was installed today, but they forgot the door sweep and handle, so they have to come back next week.

Url
Tag
Img
Thumb

IMG_20161222_153941338.jpg | Hits: 99 | Size: 65.76 KB | Posted on: 1/7/17 | Link to this image


The landscapers wanted WAAAAY too much to build this wall, so I did it myself. It took 2 trips to haul all the stone (nearly 2 pallets) on my little trailer, and I had to unload & stack them all by myself.

Url
Tag
Img
Thumb

IMG_20161222_181836633.jpg | Hits: 103 | Size: 56.64 KB | Posted on: 1/7/17 | Link to this image


I added 3 layers of fabric to keep dirt from oozing through, and a french drain (hidden in the shadow) to carry the water away.

Url
Tag
Img
Thumb

IMG_20161228_103217360.jpg | Hits: 94 | Size: 114.82 KB | Posted on: 1/7/17 | Link to this image


There's half a load of chert (the gravel for the driveway) in the far background by the dumpster; the other half in the foreground near the shop; and a full load behind my Bronco for my parking spots.

Url
Tag
Img
Thumb

IMG_20161228_200300749_HDR.jpg | Hits: 106 | Size: 68.25 KB | Posted on: 1/7/17 | Link to this image


The appliances are mostly in, but the stove isn't level, so the cabinet guys will have to come back & adjust its opening.

Url
Tag
Img
Thumb

IMG_20161230_114642301.jpg | Hits: 105 | Size: 108.14 KB | Posted on: 1/7/17 | Link to this image


I've been looking forward to having this grade fixed back close to natural so the rain stops eroding down onto the patios.

Url
Tag
Img
Thumb

IMG_20161230_114718427.jpg | Hits: 100 | Size: 123.84 KB | Posted on: 1/7/17 | Link to this image


The landscapers are carefully adjusting the grade for the runoff that I want, before planting the shrubs here.

Url
Tag
Img
Thumb

IMG_20161230_192637632.jpg | Hits: 105 | Size: 50.83 KB | Posted on: 1/7/17 | Link to this image


The new Ikea store opened, and we found some curtains & rods we liked there.

Url
Tag
Img
Thumb

IMG_20161231_141904297.jpg | Hits: 96 | Size: 56.01 KB | Posted on: 1/7/17 | Link to this image


Good news - it fits.

Url
Tag
Img
Thumb

IMG_20161231_142914011.jpg | Hits: 92 | Size: 85.17 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_142924855.jpg | Hits: 81 | Size: 100.75 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_142945284.jpg | Hits: 85 | Size: 91.23 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed. But they were supposed to turn that fabric back onto the ground before adding the black mulch around the shrubs. I'll have to fix that later...

Url
Tag
Img
Thumb

IMG_20161231_142957175.jpg | Hits: 110 | Size: 91.09 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_143019127.jpg | Hits: 90 | Size: 69.21 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_143045930.jpg | Hits: 117 | Size: 89.1 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_143104914.jpg | Hits: 110 | Size: 109.8 KB | Posted on: 1/7/17 | Link to this image


After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with grass seed.

Url
Tag
Img
Thumb

IMG_20161231_162414143.jpg | Hits: 115 | Size: 69.32 KB | Posted on: 1/7/17 | Link to this image


I installed these pop-up floor outlets myself.

Url
Tag
Img
Thumb

IMG_20161231_195949516.jpg | Hits: 109 | Size: 52.83 KB | Posted on: 1/7/17 | Link to this image


It was nerve-racking drilling through the tile, but I put up the shower curtains, mirrors, towel bars, towel rings, & toilet paper holders.

Url
Tag
Img
Thumb

IMG_20170105_134745605.jpg | Hits: 196 | Size: 49.52 KB | Posted on: 1/7/17 | Link to this image


Most of the workers are finished making dust & hauling tools in, so I uncovered & cleaned the granite for the first time since its installation.


Url
Tag
Img
Thumb

IMG_20170105_134846413.jpg | Hits: 191 | Size: 76.54 KB | Posted on: 1/7/17 | Link to this image


Although it doesn't spread far through the house, the kitchen is still spacious enough to work in comfortably.


Url
Tag
Img
Thumb

IMG_20170105_135447257_HDR.jpg | Hits: 163 | Size: 74.71 KB | Posted on: 1/7/17 | Link to this image


We plan to add a brushed stainless spatter guard on the wall between the microwave & stove.

.

Url
Tag
Img
Thumb

IMG_20170105_135744278.jpg | Hits: 182 | Size: 47.37 KB | Posted on: 1/7/17 | Link to this image


The TV will go on the wall between the big door & the fireplace.


Url
Tag
Img
Thumb

IMG_20170105_135935961.jpg | Hits: 190 | Size: 43.67 KB | Posted on: 1/7/17 | Link to this image


The 2 downstairs guest bedrooms are nearly identical.

Url
Tag
Img
Thumb

IMG_20170105_133919682.jpg | Hits: 141 | Size: 52.54 KB | Posted on: 1/7/17 | Link to this image


Her indoor swimming pool with TV that she can see from her vanity, too. The ledge beside the shower glass is for her tub accessories.

Url
Tag
Img
Thumb

IMG_20170105_134032435.jpg | Hits: 149 | Size: 58.83 KB | Posted on: 1/7/17 | Link to this image


The master shower is large enough for a wheelchair, including the 3-foot door that swings in or out.

Url
Tag
Img
Thumb

IMG_20170105_134108083.jpg | Hits: 156 | Size: 46.02 KB | Posted on: 1/7/17 | Link to this image


My vanity has plenty of cabinets, and 4 outlets.

Url
Tag
Img
Thumb

IMG_20170105_134119830_HDR.jpg | Hits: 108 | Size: 47.38 KB | Posted on: 1/7/17 | Link to this image


Her vanity has 2 swivelling mirrors & a telescoping magnifying mirror. Her outlets are behind one of the mirrors (with USB power), and under the knee space, and inside her lower cabinet at the far Left (almost out-of-frame) for a pull-out rack with her hair dryer & curling iron.

Url
Tag
Img
Thumb

IMG_20170105_134438151.jpg | Hits: 131 | Size: 43.3 KB | Posted on: 1/7/17 | Link to this image


The laundry countertop is level with the dryer so it extends the usable area. The coutertop will also be the ironing board. The shelf above the sink has a hanger rod so delicates can drip-dry.

Url
Tag
Img
Thumb

IMG_20170105_134446669.jpg | Hits: 153 | Size: 39.81 KB | Posted on: 1/7/17 | Link to this image


The washer is out of the way, but still very close to the master closets & bathroom, where most of the laundry will be produced. The hamper will go against that wall between it & the door to Lisa's closet.

Url
Tag
Img
Thumb

IMG_20170105_135952298_HDR.jpg | Hits: 217 | Size: 45.73 KB | Posted on: 1/7/17 | Link to this image


The 2 downstairs guest bedrooms are nearly identical.

Url
Tag
Img
Thumb

IMG_20170105_140039491.jpg | Hits: 204 | Size: 73.6 KB | Posted on: 1/7/17 | Link to this image


Looking West out of the downstairs guest bedrooms.

Url
Tag
Img
Thumb

IMG_20170105_140118401.jpg | Hits: 169 | Size: 125.71 KB | Posted on: 1/7/17 | Link to this image


The view to the SW out of the downstairs guest bedrooms.

Url
Tag
Img
Thumb

IMG_20170106_102541014.jpg | Hits: 187 | Size: 89.59 KB | Posted on: 1/7/17 | Link to this image


Snow day...

Url
Tag
Img
Thumb

IMG_20170107_190132079.jpg | Hits: 204 | Size: 62.33 KB | Posted on: 1/10/17 | Link to this image


I put deadbolts in that match the handles: Schlage B60N CEN 619, with the strike reinforcement plates.

Url
Tag
Img
Thumb

IMG_20170110_165824441.jpg | Hits: 201 | Size: 56.51 KB | Posted on: 1/10/17 | Link to this image


There was a substantial gap under the threshold & door frame, so I filled it with concrete patch. (The builder suggested silicone.) After the pic, I cleaned up the edge with water & a sponge.

Url
Tag
Img
Thumb

IMG_20170104_115926289.jpg | Hits: 127 | Size: 59.23 KB | Posted on: 1/7/17 | Link to this image


We spent a lot of time dremelling & hand-sanding the banister panels before I hauled them & the welder here to begin assembly.

Url
Tag
Img
Thumb

IMG_20170104_164618141.jpg | Hits: 123 | Size: 58.29 KB | Posted on: 1/7/17 | Link to this image


My brushed look isn't as smooth as commercial stuff, but I think it's going to come out OK.


Url
Tag
Img
Thumb

IMG_20170104_193741704.jpg | Hits: 115 | Size: 61.16 KB | Posted on: 1/7/17 | Link to this image


Fitting these is taking a lot longer than I expected, but so is everything else.

Url
Tag
Img
Thumb

IMG_20170105_143917331_HDR.jpg | Hits: 152 | Size: 95.64 KB | Posted on: 1/7/17 | Link to this image


I designed these to need minimal welding, but I still have to go back over the spots that are being discolored by the heat before clearcoating & installing them.


Url
Tag
Img
Thumb

IMG_20170106_113945140.jpg | Hits: 138 | Size: 59.88 KB | Posted on: 1/7/17 | Link to this image


I'm using this tubing cutter because I don't want to waste any of the length - not even a saw kerf.

Url
Tag
Img
Thumb

IMG_20170106_143633302_HDR.jpg | Hits: 111 | Size: 92.82 KB | Posted on: 1/7/17 | Link to this image


The angled cuts have to be done by saw, so I assembled this bandsaw that I bought last year.

Url
Tag
Img
Thumb

IMG_20170106_200802706.jpg | Hits: 188 | Size: 41.73 KB | Posted on: 1/7/17 | Link to this image


This was their first test-fitting after deburring & washing, and they all seem to have come out perfectly. They're just resting in-place, though ; even the ones on the angle are not attached by anything right now. I still have to assemble & install the support brackets.

Url
Tag
Img
Thumb

IMG_20170109_180644356.jpg | Hits: 194 | Size: 60.48 KB | Posted on: 1/10/17 | Link to this image


After laying out the exact location, I'm drilling an 8"-deep 1.25"-wide 1/4"-thick vertical slot into the stair wall. The bubble level on the back of the drill is surprisingly accurate.

Url
Tag
Img
Thumb

IMG_20170109_160722786.jpg | Hits: 176 | Size: 60.25 KB | Posted on: 1/10/17 | Link to this image


It takes some elbow grease to clean out the slot enough for the support to go in, but it needs to be tight.

Url
Tag
Img
Thumb

IMG_20170109_174700980.jpg | Hits: 218 | Size: 47.89 KB | Posted on: 1/10/17 | Link to this image


It's coming together slowly, but the pieces are fitting perfectly.

Url
Tag
Img
Thumb

IMG_20170109_200608901_HDR.jpg | Hits: 145 | Size: 63.09 KB | Posted on: 1/10/17 | Link to this image


The upper sections are just in-position right now - they're not supported yet. The long 1/4" bit hit some nails & broke today, so I have to pick up another tomorrow.

Url
Tag
Img
Thumb

IMG_20170109_200627276_HDR.jpg | Hits: 183 | Size: 60.46 KB | Posted on: 1/10/17 | Link to this image


Just resting in-place, but it's looking the way I imagined.

Url
Tag
Img
Thumb

IMG_20170112_185724334_HDR.jpg | Hits: 151 | Size: 59.59 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170112_185746349.jpg | Hits: 163 | Size: 52.63 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170112_185906520.jpg | Hits: 178 | Size: 49.26 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170112_190027636.jpg | Hits: 147 | Size: 52.38 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170112_190106573.jpg | Hits: 169 | Size: 39.75 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170112_190209708.jpg | Hits: 188 | Size: 39.41 KB | Posted on: 1/14/17 | Link to this image


They're still not finished, but all the pieces are fitted & installed. But I still have to disassemble it all, clean up the scuffs & weld scorching, drill holes for the handrail screws, cut & paint the (temporary) handrail and permanently install everything.

Url
Tag
Img
Thumb

IMG_20170114_163146547.jpg | Hits: 178 | Size: 51.87 KB | Posted on: 2/4/17 | Link to this image


The bottom of each post support will have a lag screw below the wall, and several drywall screws above. This one will have 2 lag screws.

Url
Tag
Img
Thumb

IMG_20170117_190623911.jpg | Hits: 183 | Size: 80.85 KB | Posted on: 2/4/17 | Link to this image


Rust-Oleum Crystal Clear Enamel Spray 596726 will give my brushed stainless a fingerprint-resistant finish.

Url
Tag
Img
Thumb

IMG_20170118_215530536.jpg | Hits: 171 | Size: 57.35 KB | Posted on: 2/4/17 | Link to this image


This temporary handrail doesn't cover the posts, but it's enough to get a certificate of occupancy. I'll build a wider one from cedar that grew on this property later.

Url
Tag
Img
Thumb

IMG_20170118_215623437.jpg | Hits: 161 | Size: 30.91 KB | Posted on: 2/4/17 | Link to this image


The upper flight handrail is just attached to the wall studs.

Url
Tag
Img
Thumb

IMG_20170118_215746341.jpg | Hits: 180 | Size: 46.18 KB | Posted on: 2/4/17 | Link to this image


The view from the hallway.

Url
Tag
Img
Thumb

IMG_20170119_132111749_HDR.jpg | Hits: 287 | Size: 64.56 KB | Posted on: 2/4/17 | Link to this image


The view from the great room.

Url
Tag
Img
Thumb

IMG_20170121_165703798.jpg | Hits: 215 | Size: 57.58 KB | Posted on: 2/4/17 | Link to this image


We made 2 loads in this to get most of our stuff to the new house. MY stuff will take several more loads with my little trailer, a rollback, and some friends.

Url
Tag
Img
Thumb

IMG_20170131_144426985.jpg | Hits: 216 | Size: 106.42 KB | Posted on: 2/28/17 | Link to this image


I wanted to build a nicer-looking stainless mailbox & post, but we needed something up, so we bought this oversized box & I built and painted the post with pivoting arm one night.

Url
Tag
Img
Thumb

IMG_20170208_230023905.jpg | Hits: 156 | Size: 40.87 KB | Posted on: 2/28/17 | Link to this image


This is just outside the master bedroom door, which makes it hard to get a good pic within the narrow hall. But it's a floating shelf unit, with a single vertical. The one by the dining table will have 2 verticals.

Url
Tag
Img
Thumb

FireBowl5.jpg | Hits: 194 | Size: 61.22 KB | Posted on: 2/28/17 | Link to this image


The process of moving in & settling is going slowly, but it's happening.

Url
Tag
Img
Thumb

FireBowl6.jpg | Hits: 180 | Size: 41.63 KB | Posted on: 2/28/17 | Link to this image


The process of moving in & settling is going slowly, but it's happening. The back patio is nicknamed "the helipad".

Url
Tag
Img
Thumb

IMG_20170304_083219260_HDR.jpg | Hits: 125 | Size: 98.8 KB | Posted on: 3/5/17 | Link to this image


FI-YAAAAA!!!

Contrary to my friends' speculation, I didn't set the county on fire, and no fire departments showed up (although I invited a few firemen I know).

UPDATE: After 2 years of pushing the remnants back together, and burning household paper/plastic, the pile got small enough to haul off into the woods and dump into some low spots.

Url
Tag
Img
Thumb

IMG_20170304_090030245.jpg | Hits: 139 | Size: 58.14 KB | Posted on: 3/5/17 | Link to this image


I expected it to blaze for a few hours, but after the first blast, it died down quickly. One of my neighbors brought his Bobcat to push it back together for more burning.

Url
Tag
Img
Thumb

IMG_20170304_091458548.jpg | Hits: 149 | Size: 83.61 KB | Posted on: 3/5/17 | Link to this image


One of my neighbors offered to help out with his (2nd) skidsteer. He re-piled it a few times to keep it burning.

Url
Tag
Img
Thumb

IMG_20170304_162127140.jpg | Hits: 131 | Size: 78.52 KB | Posted on: 3/5/17 | Link to this image


He's having way too much fun.

I'm going to try to buy his older skidsteer...

Url
Tag
Img
Thumb

IMG_20170306_014210314.jpg | Hits: 111 | Size: 56.16 KB | Posted on: 3/5/17 | Link to this image


The entry shelf is installed, and she'll start filling it soon. That just leaves the office desk (& maybe a china display beside the pantry) to build.

Url
Tag
Img
Thumb

IMG_20170318_113023071.jpg | Hits: 57 | Size: 63.88 KB | Posted on: 6/6/18 | Link to this image


Finished & loaded.

Url
Tag
Img
Thumb

IMG_20170321_095219175.jpg | Hits: 60 | Size: 77.35 KB | Posted on: 6/6/18 | Link to this image


I built this shed to move, and it made the trip without incident.

Url
Tag
Img
Thumb

IMG_20170421_100328449.jpg | Hits: 49 | Size: 104.63 KB | Posted on: 6/6/18 | Link to this image


Many of the bushes didn't last the first year.

Url
Tag
Img
Thumb

IMG_20170424_140030182.jpg | Hits: 62 | Size: 91.27 KB | Posted on: 6/6/18 | Link to this image


The trailer is nearly dragging the ground, even though I have as much weight as possible on the tongue.

Url
Tag
Img
Thumb

IMG_20170425_113357790.jpg | Hits: 55 | Size: 80.1 KB | Posted on: 6/6/18 | Link to this image


These should keep everyone on the pavement.

Url
Tag
Img
Thumb

IMG_20170428_104337627_HDR.jpg | Hits: 54 | Size: 120.35 KB | Posted on: 6/6/18 | Link to this image


Because the gas company turned the trench around, they killed this big oak next to the house. My father & I took it down, and he took the large pieces back to TX.

Url
Tag
Img
Thumb

IMG_20170711_Backsplash.jpg | Hits: 63 | Size: 69.46 KB | Posted on: 6/6/18 | Link to this image


This backsplash is just resting here - I'll attach it later.

Url
Tag
Img
Thumb

IMG_20170726_093903584.jpg | Hits: 68 | Size: 65.5 KB | Posted on: 6/6/18 | Link to this image


The generator was surging, and it took a LOOOOONG time for Generac to fix it. I'm not happy with them, but the generator is working well now.

Url
Tag
Img
Thumb

IMG_20180205_113744.jpg | Hits: 58 | Size: 62.73 KB | Posted on: 6/6/18 | Link to this image


Now that my leg is healed, I'm starting to think about the desk again.

Url
Tag
Img
Thumb

IMG_20180416_082648.jpg | Hits: 68 | Size: 44.87 KB | Posted on: 6/6/18 | Link to this image


The ceiling split in 2 places during the cold weather, and several screws popped.

Url
Tag
Img
Thumb

IMG_20180516_113016.jpg | Hits: 79 | Size: 59.41 KB | Posted on: 6/6/18 | Link to this image


I'm just getting back to the desk...

Url
Tag
Img
Thumb

IMG_20180528_180236.jpg | Hits: 64 | Size: 69.5 KB | Posted on: 6/6/18 | Link to this image


We're staining & varnishing the desk parts, just like the one we put in the previous house.

Url
Tag
Img
Thumb

IMG_20180602_095237.jpg | Hits: 64 | Size: 98.38 KB | Posted on: 6/6/18 | Link to this image


One of the leaking roof boots is being replaced.

Url
Tag
Img
Thumb

IMG_20180603_143931.jpg | Hits: 69 | Size: 90.35 KB | Posted on: 6/6/18 | Link to this image


Rain & humidity will be scarce this week, so I'm digging the cable trench. A friend loaned me his 1-ton 4WD Cummins because HD wouldn't rent me this excavator if I pulled it with my Bronco.

Url
Tag
Img
Thumb

IMG_20180603_175451.jpg | Hits: 77 | Size: 101.05 KB | Posted on: 6/6/18 | Link to this image


This bulb auger wasn't long enough, so I welded another rod to it. It's still not long enough, but it'll get close enough to punch through.

Url
Tag
Img
Thumb

IMG_20180603_182544.jpg | Hits: 62 | Size: 130.01 KB | Posted on: 6/6/18 | Link to this image


This took longer than expected, but went smoothly. There's enough cable to make a connection, but no extra since I'm not sure how much it will take to reach the street. My best guess is 980', from a 1000' spool.

Url
Tag
Img
Thumb

IMG_20180603_192346.jpg | Hits: 81 | Size: 117.61 KB | Posted on: 6/6/18 | Link to this image


Repacking the drive & parking area was top priority.

Url
Tag
Img
Thumb

IMG_20180604_104445.jpg | Hits: 72 | Size: 171.62 KB | Posted on: 6/6/18 | Link to this image


Getting through the trees in the circle and the other side of the loop took most of the morning.

Url
Tag
Img
Thumb

IMG_20180604_170724.jpg | Hits: 79 | Size: 177.81 KB | Posted on: 6/6/18 | Link to this image


By Monday evening, I was more than 1/3 through.

Url
Tag
Img
Thumb

IMG_20180609_111030.jpg | Hits: 47 | Size: 118.73 KB | Posted on: 10/15/19 | Link to this image


The boss grew up driving her father's tractor to mow their acreage, so she was a quick study on the excavator, and rearranged the burn pile.

Url
Tag
Img
Thumb

20180803_231214.jpg | Hits: 64 | Size: 76.84 KB | Posted on: 11/28/18 | Link to this image


Our couches were getting pretty worn-out, so when our furniture store announced a going-out-of-bidness sale, we chose these red ones. They're pretty close to the color of the recliner.

Url
Tag
Img
Thumb

20180803_231709.jpg | Hits: 76 | Size: 76.09 KB | Posted on: 11/28/18 | Link to this image


Our couches were getting pretty worn-out, so when our furniture store announced a going-out-of-bidness sale, we chose these red ones. They're pretty close to the color of the recliner. We also got the triangular glass table and the bar stools (finally).

Url
Tag
Img
Thumb

IMG_20180831_234718.jpg | Hits: 42 | Size: 76.08 KB | Posted on: 10/15/19 | Link to this image


The desk came out pretty much like I planned, at about 1/4 the cost that the finish carpenters bid. Later, I'll add some shelves above, that mimic the desktop's contours, except at the windows.

Url
Tag
Img
Thumb

IMG_20180831_234801.jpg | Hits: 55 | Size: 60.6 KB | Posted on: 10/15/19 | Link to this image


It didn't take her long to start moving into the closet, which is mainly there for her hobby stuff.

Url
Tag
Img
Thumb

20180930_174044.jpg | Hits: 86 | Size: 87.08 KB | Posted on: 11/28/18 | Link to this image


The flower beds really filled-out this fall.

Url
Tag
Img
Thumb

20180930_174103.jpg | Hits: 71 | Size: 104.38 KB | Posted on: 11/28/18 | Link to this image


The flower beds really filled-out this fall.

Url
Tag
Img
Thumb

20181116_181034.jpg | Hits: 73 | Size: 65.97 KB | Posted on: 11/28/18 | Link to this image


The weather has been perfect for sitting out by the fire bowl & talking to the owls.


Url
Tag
Img
Thumb

IMG_20181028_230830.jpg | Hits: 55 | Size: 56.58 KB | Posted on: 10/15/19 | Link to this image


The cabinet crew did a spectacularly BAD job of supporting the sinks, and the kitchen sink completely fell away from the granite, as this pic shows. So I had to design, build, fit, & install some supports with everything assembled. But after I got done, I could jump in the sink, and it wouldn't budge.

Url
Tag
Img
Thumb

P_20181122_144551_vHDR_Auto.jpg | Hits: 71 | Size: 120.33 KB | Posted on: 11/28/18 | Link to this image


One of the trees near the cable trench died, so now there's even MORE firewood.

Url
Tag
Img
Thumb

IMG_20190130_161234.jpg | Hits: 56 | Size: 80.61 KB | Posted on: 10/15/19 | Link to this image


The fireplace is fully-functional, but we haven't needed to burn real wood in it yet. So to make it look less-empty, I bought some fake logs and hooked them to the gas line.

Url
Tag
Img
Thumb

IMG_20190502_173925.jpg | Hits: 46 | Size: 107.41 KB | Posted on: 10/15/19 | Link to this image


After I got done burying the 1,000 feet of RG11, I called to get it connected. But they said it was the wrong cable, and again refused to tell me what the RIGHT cable would be. But they did offer to install the right cable for $8,000.

So I snagged a few samples from some passing cable service trucks, and then spent a few months trying to buy it. But no one would sell me just the ~1,000 feet that I needed; only a full ~2,500-foot spool for ~$0.90/ft plus truck freight & dock service. And I'd still have to haul it home, and then get it into the ground.

It took me the better part of a year to find a NOS spool that I could buy closer to $0.80/ft, and it was only ~300-mile-round-trip away! So after a long day on the road, I got home with 430 lbs of CommScope P3-625-JCASS, and put it into my yard trailer on a custom-built rack.

Url
Tag
Img
Thumb

IMG_20190502_182342.jpg | Hits: 59 | Size: 94.28 KB | Posted on: 10/15/19 | Link to this image


I had to use the zero-turn for the really-rough terrain because it's a heavier & stronger mower. I didn't want to cut a trail wide enough for a truck through the woods. It worked better than I expected, and only got stuck on the steepest section. But it was easy to winch up.

Url
Tag
Img
Thumb

IMG_20190518_124410_01.jpg | Hits: 72 | Size: 80.92 KB | Posted on: 10/15/19 | Link to this image


Since I had dug it just a year before with the track-hoe, I was able to use this lighter, cheaper trencher to go back with the bigger cable. And on the flatter ground near the house, the lawn tractor was easier to pull the trailer with.

After I got it buried, I called again to get connected. A couple weeks later, they sent out an installer in a van who obviously couldn't do anything. After a couple of months arguing with them, they finally sent out someone who understood what needed to be done, and then told me it was the wrong cable. But they did offer to install the right cable for $11,000.

After a few more weeks arguing, they decided to try using this cable. About a month later, it still wasn't connected.

Url
Tag
Img
Thumb

IMG_20190820_083150.jpg | Hits: 62 | Size: 101.02 KB | Posted on: 10/15/19 | Link to this image


This crew is only setting an empty plastic box on the ground around the end of the cable that I buried. It took at least 3 more crews & 4 visits before I'd actually have cable service.

Url
Tag
Img
Thumb

IMG_20190927_134543.jpg | Hits: 74 | Size: 109.17 KB | Posted on: 10/15/19 | Link to this image


This crew is boring under the road to extend their system closer to my cable. But they're not connecting anything - just putting the cable under the road. IDK why they couldn't have strung it overhead.

Still at least 2 more visits before I can have service...

Url
Tag
Img
Thumb

20191001_094925.jpg | Hits: 68 | Size: 141.46 KB | Posted on: 10/15/19 | Link to this image


The next crew actually connected all the cable sections to their system, and checked the signal strength outside my house. The last time they told me I put in the wrong cable, they said it was because it wouldn't carry the signal well enough over that distance, and that P3-875-JCASS was necessary. This meter indicates I have at least 4x the necessary signal strength; about 3x better than most houses near the pavement.

But I'm still at least 1 more visit away from service, and that's going to be about 2 weeks.


About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2022 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog