White vinyl low-E windows with prarie caming
Url
Tag
Img
Thumb
Interior doors
Url
Tag
Img
Thumb
Pocket door handles; bought this one; need 5 more NON-latching
Url
Tag
Img
Thumb
Bricks will be Acme Highland Gray, similar to this.
Url
Tag
Img
Thumb
Stone siding to be used outside the fireplace, and as quoins at most of the corners.
Url
Tag
Img
Thumb
Woodburning fireplace with gas lighter will have red herringbone refractory panels, glass doors with...
Url
Tag
Img
Thumb
Floor tile Marazzi Harmony Pitch 6x36" everywhere (1177sqft) except bedrooms & their closets, s...
Url
Tag
Img
Thumb
Master bath tub: Fleurco Aria Harmony (bought)
Master tub faucet: Kohler Refinia K-T5325-4-BN & K-53...
Url
Tag
Img
Thumb
Her tub spout Kohler Refinia K-5328-BN

Guest tubs will use the popup version of this spout Kohler R...
Url
Tag
Img
Thumb
Her tub handles Kohler Refinia T5324-4-BN
Url
Tag
Img
Thumb
Master shower will have a glass wall on the Left above the tub (24"), then a 1' wide inoperable...
Url
Tag
Img
Thumb
The master bathroom & shower walls (209sqft) will be 18" Italian Carrarra Bianca marble (we bou...
Url
Tag
Img
Thumb
Tub surround tile for both guest baths will be Florentine Scabos porcelain.
Url
Tag
Img
Thumb
Toilets
Url
Tag
Img
Thumb
Vanity sinks will probably be trench style; white in the master, and biscuit in the guests.
Url
Tag
Img
Thumb
All vanity faucets are Moen Zarina L84533SRN withOUT base plate; Bought 5
Url
Tag
Img
Thumb
Kitchen sink undermount Revere RCFU3119R

Faucet w/o baseplate centered behind divider
Soap pump beh...
Url
Tag
Img
Thumb
Granite layout: faucet should be centered withOUT base plate; soap pump should be behind the Left co...
Url
Tag
Img
Thumb
Kitchen faucet Brizo 63255LF-SS Vuelo (no base plate) Bought
Url
Tag
Img
Thumb
Kitchen granite Cosmic Black
Url
Tag
Img
Thumb
Kitchen cabinets will be cherry slabs with brushed arc pulls
Url
Tag
Img
Thumb
Kitchen cabinets will be cherry slabs with brushed arc pulls
Url
Tag
Img
Thumb
Pulls will be 4" Brushed Nickel Arcs throughout the house
Url
Tag
Img
Thumb
Laundry & utility sinks' faucet is a no-brand pull-out mid-rise; bought 2.
Url
Tag
Img
Thumb
Possible kitchen stools: Amisco bar-height with Dayglam finish on the steel frame & Stratus upholste...
Url
Tag
Img
Thumb
Microwave GE PSA9240SSFS; bought
Slide-in stove GE PS920SSFS; bought
Refrigerator GE PFE28RSHSS; bou...
Url
Tag
Img
Thumb
USB outlets will be provided in most rooms, though NOT this style; bought 8
Url
Tag
Img
Thumb
Entry light will be Layla 3; bought
Url
Tag
Img
Thumb
Dining room light Layla 9; bought
Url
Tag
Img
Thumb
Kitchen island light Vaxcel Helsinki 4 pendant; bought
Url
Tag
Img
Thumb
Bathroom vanity lights Vaxcel Helsinki 3 sconce; Bought 5
Url
Tag
Img
Thumb
Possibly for laundry & other
Url
Tag
Img
Thumb
Possibly for vaulted ceiling & other
Url
Tag
Img
Thumb
Surface LEDs look like recessed lights for kitchen, fireplace, & rear wall; bought 1 pair; need 4 mo...
Url
Tag
Img
Thumb
Possibly for laundry & others
Url
Tag
Img
Thumb
Possibly for attic & others; bought 1
Url
Tag
Img
Thumb
Bought
Url
Tag
Img
Thumb
The master patio retaining wall should look something like this one near Clayton Bank.
Url
Tag
Img
Thumb
The weather has been reasonably dry for a few days now, so I called a container company & ordered a ...
Url
Tag
Img
Thumb
The weather has been reasonably dry for a few days now, so I called a container company & ordered a ...
Url
Tag
Img
Thumb
The weather has been reasonably dry for a few days now, so I called a container company & ordered a ...
Url
Tag
Img
Thumb
I started collecting some of the brush I've cut, and moving it to a clearing to burn later.
Url
Tag
Img
Thumb
I started collecting some of the brush I've cut, and moving it to a clearing to burn later.
Url
Tag
Img
Thumb
Several stumps had to be pulled out.
Url
Tag
Img
Thumb
Several dead trees came down.
Url
Tag
Img
Thumb
The road crew brought in some equipment June 19 to start clearing the next day.
Url
Tag
Img
Thumb
Pace made much faster progress June 20 than I had been doing.
Url
Tag
Img
Thumb
Pace made much faster progress than I had been doing.
Url
Tag
Img
Thumb
It didn't take long for them to widen my trails into a road by June 23.
Url
Tag
Img
Thumb
This is the clearing for the house on June 24.
Url
Tag
Img
Thumb
The burn pile is getting big...
Url
Tag
Img
Thumb
After the road bed was cleared, a trench was dug June 30 for the underground power & gas.
Url
Tag
Img
Thumb
Skelton Electric & Somerville Gas arrived July 1.
Url
Tag
Img
Thumb
When the electrician & gas company left July 1, the trench was packed by a radio-controlled roller, ...
Url
Tag
Img
Thumb
After the road bed was filled & graded July 9, we cut in the culverts.
Url
Tag
Img
Thumb
 Header walls were poured August 14 to protect the driveway entrance and anchor that culvert.
Url
Tag
Img
Thumb
The driveway surface during construction will be chert rock, which was brought in August 26 from a q...
Url
Tag
Img
Thumb
The driveway surface during construction will be chert rock, which was brought in August 26 from a q...
Url
Tag
Img
Thumb
Gotta keep the gravel from growing too high.
Url
Tag
Img
Thumb
I had 2 number plates plasma-cut from 1/4" stainless steel, and hung them on the headers Septem...
Url
Tag
Img
Thumb
There's some erosion where this flow meets the ditch, but it appears to be slowing down as it gets t...
Url
Tag
Img
Thumb
This was caused by an obstruction on the other side forcing rain to flow across the driveway.
Url
Tag
Img
Thumb
The last floorplan (downstairs only) in DraftSight.  There were a few minor changes, but this is ess...
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.  They started on the house March 16.

Most of the fil...
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.
Url
Tag
Img
Thumb
The Paynes are building the house & shed pads.
Url
Tag
Img
Thumb
The house pad survived its first heavy rain March 24 fairly well.
Url
Tag
Img
Thumb
The Skeltons are setting the meter base March 16.
Url
Tag
Img
Thumb
The Skeltons are setting the 400A 1Ph meter base, and this small 100A outdoor box which will remain ...
Url
Tag
Img
Thumb
Chickasaw brought in power on March 29-30.
Url
Tag
Img
Thumb
Chickasaw brought in power on March 29-30, but Somerville won't connect the gas until the house is u...
Url
Tag
Img
Thumb
This is the first junction box along the driveway.
Url
Tag
Img
Thumb
This is the second junction box along the driveway.
Url
Tag
Img
Thumb
The transformer is close to the meter & extra panel, between the house & shed.
Url
Tag
Img
Thumb
Water Well Solutions drilled about 190' near the transformer & meter April 6, and returned to set th...
Url
Tag
Img
Thumb
They came back April 22-23 to install the pump 160' down, the tank, &  the shutoff.
Url
Tag
Img
Thumb
Batter boards went up April 19.
Url
Tag
Img
Thumb
After the engineer approved the house pad, All About Plumbing tore into it April 25.
Url
Tag
Img
Thumb
After the engineer approved the house pad, All About Plumbing tore into it April 25.
Url
Tag
Img
Thumb
The plumbing is buried, and we're waiting for several storms to blow over before concrete can be pou...
Url
Tag
Img
Thumb
The Paynes are working on the shed pad April 28, but storms for the next few days will postpone its ...
Url
Tag
Img
Thumb
Floor electrical, reinforcing steel, & termite pretreat went down May 5.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured Sat, May 7.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured Sat, May 7.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured Sat, May 7.
Url
Tag
Img
Thumb
Between rain storms, the slab was poured Sat, May 7.
Url
Tag
Img
Thumb
May 9, the front porch, West porch, & master shower were poured.
Url
Tag
Img
Thumb
May 9, the front porch, West porch, & master shower were poured.
Url
Tag
Img
Thumb
May 9, the front porch, West porch, & master shower were poured.
Url
Tag
Img
Thumb
May 9, the front porch, West porch, & master shower were poured.
Url
Tag
Img
Thumb
Intermittent rain delayed delivery of the 1st floor lumber package.
Url
Tag
Img
Thumb
This is just for the first floor walls, and some floor decking for upstairs.
Url
Tag
Img
Thumb
We went through about 5 framers who cancelled on us for various reasons, so this sat here for over a...
Url
Tag
Img
Thumb
They only worked half a day, and a lot of that was snapping lines, but they're moving...
Url
Tag
Img
Thumb
The framers are working a previous job today, but they got a lot done in a day & half here so far.
Url
Tag
Img
Thumb
The framers are working a previous job today, but they got a lot done in a day & half here so far.
Url
Tag
Img
Thumb
The framers are working a previous job today, but they got a lot done in a day & half here so far.
Url
Tag
Img
Thumb
I was surprised to find the framers (a short crew) working today.
Url
Tag
Img
Thumb
This is the fireplace.
Url
Tag
Img
Thumb
This is from Guy's room looking past the stairs (whose wall was incorrectly built full-height) towar...
Url
Tag
Img
Thumb
This is where the framers stopped today.
Url
Tag
Img
Thumb
This is where the framers stopped today.
Url
Tag
Img
Thumb
Beams & joists started going up yesterday; most of them are done today, but there are a few errors.....
Url
Tag
Img
Thumb
The rafter & 2nd-floor lumber package was delivered a few hours ago.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Great room looking SE.
Url
Tag
Img
Thumb
Great room looking NW.
Url
Tag
Img
Thumb
The front porch roof isn't right yet, but the framer will fix it Monday.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
This was the 2nd attempt at the stairs - it turned out wrong, too.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
This door was set wrong, and the casing was broken when removed to correct the problem, so another c...
Url
Tag
Img
Thumb
The front door showed up a couple of weeks late, but in good condition.
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
I spent a few hours with a new leaf blower & broom cleaning up behind the framers, and marking their...
Url
Tag
Img
Thumb
This storm took down some branches on my property, but it laid a tree across McFadden and a few othe...
Url
Tag
Img
Thumb
Most of the felt stayed on the house, but it still got very wet inside.
Url
Tag
Img
Thumb
The ducts were delivered, and installation started a day or so later.
Url
Tag
Img
Thumb
I built this steel column for the NW porch, and welded wires on for the stones that will surround it...
Url
Tag
Img
Thumb
These are the main water connections inside the wall between the master bathroom & Lisa's closet.  T...
Url
Tag
Img
Thumb
Shingles going up...
Url
Tag
Img
Thumb
I really wanted a metal roof, but it just didn't happen.
Url
Tag
Img
Thumb
The framer fixing another mistake...
Url
Tag
Img
Thumb
Chimney chase going in.  The contractor & I had to help because the framer only brought 1 helper & n...
Url
Tag
Img
Thumb
After a lot of discussion, this was eventually built the way the plans show.  When it was finished, ...
Url
Tag
Img
Thumb
Drainage pattern looking out the master bedroom sliding door.
Url
Tag
Img
Thumb
I cleaned after the electricians' first day of work, but it didn't last.
Url
Tag
Img
Thumb
Upstairs bathroom wiring, plumbing, & ducts.
Url
Tag
Img
Thumb
Ducts above the living room along the SW wall above the big sliding door.
Url
Tag
Img
Thumb
Water heater above the master bathroom eventually got the correct vent in the correct location.
Url
Tag
Img
Thumb
2nd attic looking W.
Url
Tag
Img
Thumb
Looking E from bedroom 3 out through the garage.
Url
Tag
Img
Thumb
Looking E from the utility porch out through the garage.
Url
Tag
Img
Thumb
Drops, unused materials, and trash are piling up in the garage...
Url
Tag
Img
Thumb
Looking SE from the master toilet toward the generator porch.
Url
Tag
Img
Thumb
The framers used yellow pine for the garage door casing, and ran it all the way down tight to the co...
Url
Tag
Img
Thumb
Because of all the circuits, and the generator, we had to have 2 panels.  The smaller one is NOT on ...
Url
Tag
Img
Thumb
Bricks & stone were delivered.
Url
Tag
Img
Thumb
I'll paint the lintels tomorrow.
Url
Tag
Img
Thumb
We plan to have about 18" of stone at each corner (instead of brick quoins), and all the way ar...
Url
Tag
Img
Thumb
After the tie inspection yesterday, the bricklayers started this morning.
Url
Tag
Img
Thumb
After the tie inspection yesterday, the bricklayers started this morning.
Url
Tag
Img
Thumb
We chose to have no soldiers anywhere; in the bricks or in the stones.
Url
Tag
Img
Thumb
After a break yesterday, brick work continued today on the North side.
Url
Tag
Img
Thumb
The South & SW sides' brick is done.
Url
Tag
Img
Thumb
The South & SW sides' brick is done.
Url
Tag
Img
Thumb
The master & office sides' (East of the front door) brick is done.
Url
Tag
Img
Thumb
But the front door, dining room, & garage brick hasn't been started yet.  The front porch will be st...
Url
Tag
Img
Thumb
The well was connected to the house plumbing today, but the house wasn't pressurized yet.  The insid...
Url
Tag
Img
Thumb
Cleaning day - no one was working.
Url
Tag
Img
Thumb
Cleaning day - no one was working.
Url
Tag
Img
Thumb
Cleaning day - no one was working.
Url
Tag
Img
Thumb
Cleaning day - no one was working.
Url
Tag
Img
Thumb
Somerville Gas was connected today.  They killed that big oak by cutting its roots all the way aroun...
Url
Tag
Img
Thumb
Somerville connected the gas today. It cost them 2 broken pieces of equipment, and several hours loo...
Url
Tag
Img
Thumb
Somerville Gas was connected to the meter today.  I think they're waiting for the fireplace before c...
Url
Tag
Img
Thumb
Stones are going up.
Url
Tag
Img
Thumb
Stones are going up.
Url
Tag
Img
Thumb
The tile man hung most of the backer board.  This is downstairs.
Url
Tag
Img
Thumb
The tile man hung most of the backer board.  This is upstairs.
Url
Tag
Img
Thumb
The tile man hung most of the backer board and floated the shower floor.
Url
Tag
Img
Thumb
The tile man sealed the backer board, and made a mess on the downstairs tub.
Url
Tag
Img
Thumb
The tile man sealed the backer board, but the tub faucet has to be changed.
Url
Tag
Img
Thumb
Most of the stone is finished, but the arch supports have to stay in a few more days.
Url
Tag
Img
Thumb
After MANY delays, the fireplace went in.  It has the wrong  refractory panels, though.  And it can'...
Url
Tag
Img
Thumb
This is the flue; stainless inner - galvanized outer.
Url
Tag
Img
Thumb
The vinyl guys started today, and are making fast progress.
Url
Tag
Img
Thumb
This can't be fully-wrapped until that temporary pole is moved.

[url=http://www.supermotors.net/reg...
Url
Tag
Img
Thumb
The first day's vinyl was mostly on the South faces.
Url
Tag
Img
Thumb
No vinyl on the front yet.
Url
Tag
Img
Thumb
The vinyl crew didn't get to this side today, but the porch overhangs can't be covered until the foa...
Url
Tag
Img
Thumb
The plumber connected the fireplace today.
Url
Tag
Img
Thumb
The plumber moved the island pipes today
Url
Tag
Img
Thumb
The plumber turned the shutoff around today.
Url
Tag
Img
Thumb
Most of the front got vinyl on their 2nd day of work.
Url
Tag
Img
Thumb
No change back here.
Url
Tag
Img
Thumb
No change back here.
Url
Tag
Img
Thumb
Another branch came down today during a thunderstorm.
Url
Tag
Img
Thumb
I built this column last night & set it today so the vinyl crew can continue here tomorrow.  It's re...
Url
Tag
Img
Thumb
The garage walls were sheeted in preparation for foam insulation, but framing has not passed inspect...
Url
Tag
Img
Thumb
1,000gal septic tank going in the ground.
Url
Tag
Img
Thumb
1,000gal septic tank going in the ground.
Url
Tag
Img
Thumb
Too much gravel (R of the tree) was delivered for the curtain drain.
Url
Tag
Img
Thumb
After blowing a hydraulic hose, the backhoe is back to work on the leach field.
Url
Tag
Img
Thumb
The West half of the curtain drain.
Url
Tag
Img
Thumb
The North half of the curtain drain.
Url
Tag
Img
Thumb
2nd terrace of the leach field.
Url
Tag
Img
Thumb
There are 500' of leach field.
Url
Tag
Img
Thumb
There are 500' of leach field.
Url
Tag
Img
Thumb
The excess gravel has been removed, and some of the excavation has been smoothed.
Url
Tag
Img
Thumb
The leach field has been smoothed.
Url
Tag
Img
Thumb
After filling the septic tank and watering the dirt pile above it for a couple of days, some sinkhol...
Url
Tag
Img
Thumb
Foaming began Friday, with the porch overhangs and then the 2nd attic rafters.
Url
Tag
Img
Thumb
Saturday, the rafters over the great room & master suite got foamed.
Url
Tag
Img
Thumb
Saturday, the rafters over the great room & master suite got foamed.
Url
Tag
Img
Thumb
Saturday, some of the guest wing's walls got foamed.
Url
Tag
Img
Thumb
The rest of the house was foamed Monday.
Url
Tag
Img
Thumb
The rest of the house was foamed Monday.
Url
Tag
Img
Thumb
The rest of the house was foamed Monday.
Url
Tag
Img
Thumb
After the foam crew picked up their trimmings & trash, I cleaned the house again with the leaf blowe...
Url
Tag
Img
Thumb
After the foam crew picked up their trimmings & trash, I cleaned the house again with the leaf blowe...
Url
Tag
Img
Thumb
The fireplace installer capped the chimney either the 12th or 13th.
Url
Tag
Img
Thumb
The electricians hung the outside boxes on the 13th.
Url
Tag
Img
Thumb
On the 14th, the ditch was dug and the electricians connected the panels to the meter, but the house...
Url
Tag
Img
Thumb
On the 14th, the ditch was dug and the electricians connected the panels to the meter, but the house...
Url
Tag
Img
Thumb
The interior walls on the master wing were insulated for sound-deadening, but none on the guest wing...
Url
Tag
Img
Thumb
This is the first time since the framers started that the garage has been clean.
Url
Tag
Img
Thumb
The vinyl crew finished the overhangs.
Url
Tag
Img
Thumb
The vinyl crew finished the overhangs.
Url
Tag
Img
Thumb
The vinyl crew finished the overhangs.
Url
Tag
Img
Thumb
The ditch man backfilled the electrical surprisingly-well; there was almost no settling even after s...
Url
Tag
Img
Thumb
The sheetrock & materials were delivered on the 15th, but none was hung.
Url
Tag
Img
Thumb
The sheetrock & materials were delivered on the 15th, but none was hung.
Url
Tag
Img
Thumb
They got about half the house done on the 16th.
Url
Tag
Img
Thumb
They got about half the house done on the 16th.  I expected that seam at the top of the vaulted stai...
Url
Tag
Img
Thumb
They got about half the house done on the 16th.
Url
Tag
Img
Thumb
The framer crowned one celing joist down, and the sheetrock boss told the crew to sheet it for some ...
Url
Tag
Img
Thumb
The rest of the house was sheeted Saturday (this is the kitchen), but one spot was covered that shou...
Url
Tag
Img
Thumb
The rest of the house was sheeted Saturday, but one spot was covered that shouldn't be.  And the ele...
Url
Tag
Img
Thumb
The rest of the house was sheeted Saturday, but one spot was covered that shouldn't be.  And the ele...
Url
Tag
Img
Thumb
The framers fixed the joist so the ceiling is flat.
Url
Tag
Img
Thumb
This backer board is too high under the outlets, so it needs to be cut for more drywall.
Url
Tag
Img
Thumb
The masonry contractor was cleaning up and ripped out a window ledge, damage some Aluminum trim, and...
Url
Tag
Img
Thumb
After cleaning up the drywall debris that had been thrown out & piled in the garage, the forming cre...
Url
Tag
Img
Thumb
Master patio

The form runs too far on the left.
Url
Tag
Img
Thumb
Driveway
Url
Tag
Img
Thumb
This is a conduit for wiring or irrigation in front of the front porch.
Url
Tag
Img
Thumb
The first truck did about half the driveway.

The green pipes are for the gutter downspouts.
Url
Tag
Img
Thumb
The second truck finished the driveway, but not the parking pad beside the garage.
Url
Tag
Img
Thumb
Control joints going in during finishing.
Url
Tag
Img
Thumb
I'll probably keep the barriers up for a week to let this really cure.
Url
Tag
Img
Thumb
Back patio forms going up.

The green pipes are for the gutter downspouts.  Only a few joints are gl...
Url
Tag
Img
Thumb
While waiting for a truck, the concrete crew worked on a lump they left in the house slab.  I expect...
Url
Tag
Img
Thumb
While concrete was being poured outside, the drywall was being sanded inside.  Sometimes it looked l...
Url
Tag
Img
Thumb
Master patio coming up to grade.
Url
Tag
Img
Thumb
I didn't see when the doors & trim were delivered, but there was one with the wrong hinges, and anot...
Url
Tag
Img
Thumb
I didn't see when the doors & trim were delivered.
Url
Tag
Img
Thumb
The back patio is going down.  They're almost to the point of putting the downspout pipes back in.
Url
Tag
Img
Thumb
The extra parking pad is poured.
Url
Tag
Img
Thumb
One more truck with ~8yds is on the way to finish the master patio & sidewalk.
Url
Tag
Img
Thumb
Master patio going down.
Url
Tag
Img
Thumb
I'm wetting all the concrete down about every other day, and it's hard to keep it all wet because it...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.  The trash can was almost too heavy for m...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes.  The trash can ...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out.

I'm not sure if that bulge in the drywal...
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes.
Url
Tag
Img
Thumb
I spent ~6hrs today sweeping & leaf-blowing the house out, including the wall boxes.
Url
Tag
Img
Thumb
All the dust interferes with the flash & focus.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
Master & back patios

AKA the helipad
Url
Tag
Img
Thumb
Back patio
Url
Tag
Img
Thumb
Driveway & parking pad
Url
Tag
Img
Thumb
The 2nd column is taking a lot longer than the replacement mason expected - he'll have to come back ...
Url
Tag
Img
Thumb
He came back Sunday to finish the column & window ledge.
Url
Tag
Img
Thumb
He came back Sunday to finish the column & window ledge.
Url
Tag
Img
Thumb
He fixed this major damage, but left all the little errors for the masons who made them.
Url
Tag
Img
Thumb
Almost nothing has happened for the past 2 weeks, waiting for paint & tile.  But before the tile goe...
Url
Tag
Img
Thumb
Early Wednesday morning, I loaded about a ton of tile from the container to the trailer, and then mo...
Url
Tag
Img
Thumb
They got off to a fast start, and then seemed to slow down.
Url
Tag
Img
Thumb
While they worked, I scraped & swept (even where they won't be laying tile).
Url
Tag
Img
Thumb
Somehow, they ran out of tile for the master bathroom floor.
Url
Tag
Img
Thumb
They worked until almost 10PM.
Url
Tag
Img
Thumb
This tub's shelves are the way I said...
Url
Tag
Img
Thumb
These are backward - we want the high shelf near the shower, and the low shelf away.
Url
Tag
Img
Thumb
The master shower floor went down quickly.
Url
Tag
Img
Thumb
With the bulk of the floor done, the cabinets came in, but they didn't get the kick on this side of ...
Url
Tag
Img
Thumb
They almost goofed the cabinet spacing, too, but it's correct now.
Url
Tag
Img
Thumb
Each of the tub rooms has a tall cabinet beside the vanity.
Url
Tag
Img
Thumb
The downstairs toilet just has a small vanity.
Url
Tag
Img
Thumb
The laundry counter will be L-shaped, and level with the dryer.
Url
Tag
Img
Thumb
My vanity also has a tall cabinet.
Url
Tag
Img
Thumb
Hers has a similar tall cabinet, and knee space for makeup.  We chose the same pulls that we have in...
Url
Tag
Img
Thumb
After cabinets, trim work began.  The baseboard has a simple quarter-round routed onto it, and there...
Url
Tag
Img
Thumb
The baseboards wrap around the bullnose corners.
Url
Tag
Img
Thumb
While they were working on trim, I built the bench & painted the utility room walls.
Url
Tag
Img
Thumb
While they were working on trim, I built the bench & painted the utility room walls.
Url
Tag
Img
Thumb
When the cabinet guys left, the tile guys came back to fix the problem tiles.
Url
Tag
Img
Thumb
They also reversed the shelves in the upstairs tub surround.
Url
Tag
Img
Thumb
There were a lot of lumps in the great room.
Url
Tag
Img
Thumb
The trim carpenter had to tear out sheetrock, tile, & framing to fix the office closet door.
Url
Tag
Img
Thumb
There was a gap in the stove pocket tile...
Url
Tag
Img
Thumb
...and another gap under the island.
Url
Tag
Img
Thumb
Several more problems in the master hall.
Url
Tag
Img
Thumb
The electrician set the generator, other than the gas connection.
Url
Tag
Img
Thumb
The pantry & office closet will have similar shelves, but the office will have wire above eye-level.
Url
Tag
Img
Thumb
Most of the master shower surround & wainscot marble went up in a day.
Url
Tag
Img
Thumb
The penthouse tenants are going to be a problem.  I'll have to get a long ladder to run them out one...
Url
Tag
Img
Thumb
The garage is getting cluttered again, but the workshop is going up.  The red iron is visible above ...
Url
Tag
Img
Thumb
The master shower marble came out the way we wanted.
Url
Tag
Img
Thumb
These are overdue, and we're still waiting on the other one.
Url
Tag
Img
Thumb
It's great to have enough doors to close the house up now.  The trim carpenter is working on the sta...
Url
Tag
Img
Thumb
The trim carpenter is moving along.
Url
Tag
Img
Thumb
He made a little mess on the helipad.
Url
Tag
Img
Thumb
We're still waiting on the mason to finish up the brick punch list.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
We're pricing stone around the fireplace, and the painters are due Saturday.
Url
Tag
Img
Thumb
The 2 downstairs bedrooms.
Url
Tag
Img
Thumb
We get a LOT of sunlight through the 96sqft patio door in the afternoons.
Url
Tag
Img
Thumb
Url
Tag
Img
Thumb
There's a lot of sunlight in the master hall, too.
Url
Tag
Img
Thumb
Laundry room
Url
Tag
Img
Thumb
Master shower
Url
Tag
Img
Thumb
The entry looks straight through to the main patio.
Url
Tag
Img
Thumb
Utility room with sink & workbench
Url
Tag
Img
Thumb
The helipad is clean again.
Url
Tag
Img
Thumb
I had to finish mowing this field with a flashlight.
Url
Tag
Img
Thumb
The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of d...
Url
Tag
Img
Thumb
The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of d...
Url
Tag
Img
Thumb
The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of d...
Url
Tag
Img
Thumb
The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of d...
Url
Tag
Img
Thumb
This outlet is required by code.
Url
Tag
Img
Thumb
The painters put down the first full coat, but over a lot of sheetrock problems, and over a lot of d...
Url
Tag
Img
Thumb
There's a tiny leak from one of the water heater fittings, but the catch pan is doing its job.
Url
Tag
Img
Thumb
The mason is acid-washing the brick, but it's going to take at least another pass to remove all the ...
Url
Tag
Img
Thumb
The master bath walls are now the right color.
Url
Tag
Img
Thumb
The [url=http://http://www.supermotors.net/registry/6396/86189-2]shop[/url] is also going up.
Url
Tag
Img
Thumb
The garage door is partially installed; the caming & insulation are missing, though.
Url
Tag
Img
Thumb
The electricians are putting up light fixtures.  These are over the kitchen island.
Url
Tag
Img
Thumb
Hall light fixtures.
Url
Tag
Img
Thumb
We're using these ceiling fans all over the house, except the office.  These in the LR & the master ...
Url
Tag
Img
Thumb
Another mason is putting up the fireplace facade using fake stone.
Url
Tag
Img
Thumb
Other than the spatter on the fireplace, this came out just the way she wanted.
Url
Tag
Img
Thumb
The garage will be well-lit with 4 of these 4-foot LEDs from Sam's, and the opener's light.  The fro...
Url
Tag
Img
Thumb
The front of the house has 3 motion-sensor LED floods, and 2 cameras.
Url
Tag
Img
Thumb
The garage door is insulated, and has the matching Prairie caming.
Url
Tag
Img
Thumb
We paid a little extra to get the door made in tan instead of painted on-site.
Url
Tag
Img
Thumb
The electricians couldn't put all the circuits on one panel, so the smaller one is NOT on the genera...
Url
Tag
Img
Thumb
This light is dimmable, and on a separate circuit from the others.
Url
Tag
Img
Thumb
The coach lights are on a separate switch from the main helipad floodlights.  The far flood & the li...
Url
Tag
Img
Thumb
The helipad has plenty of light for night landings.
Url
Tag
Img
Thumb
That's the exit motion LED above the walkway to my parking spots, and the master patio.  The porch l...
Url
Tag
Img
Thumb
These motion lights come on for cars entering from the driveway.
Url
Tag
Img
Thumb
The light by the garage is motion; the other floods are switched in the utility room.
Url
Tag
Img
Thumb
These floods light the area around the utility porch (where the riding mower will be parked).  The p...
Url
Tag
Img
Thumb
The concrete crew left a depression in the existing bank that allowed a torrent from the high ground...
Url
Tag
Img
Thumb
It's a good thing we had the huge back door (and cement leading to it) because this dolly was too ta...
Url
Tag
Img
Thumb
The fabrication shop produced the parts I designed for the banister; now, I have to finish, assemble...
Url
Tag
Img
Thumb
The appliances were delivered today, but the washer was damaged.  Later, I found one of the racks fo...
Url
Tag
Img
Thumb
The landscapers surprised me, so I had to rush out & buy ~$1200 of plants this morning.
Url
Tag
Img
Thumb
They've done most of the grading, and now we're setting out the pots where they'll be planted.
Url
Tag
Img
Thumb
We spent a little extra to get a few larger plants.
Url
Tag
Img
Thumb
We spent a little extra to get a few larger plants.
Url
Tag
Img
Thumb
While the landscapers worked outside, the plumbers worked inside.  The pool drain had to be moved a ...
Url
Tag
Img
Thumb
We had the garage floor sealed, but we skipped the sprinkles.
Url
Tag
Img
Thumb
With most of the drywall & paint finished, the carpet went down in 1 day.  I think this was the only...
Url
Tag
Img
Thumb
With most of the drywall & paint finished, the carpet went down in 1 day.  I think this was the only...
Url
Tag
Img
Thumb
With most of the drywall & paint finished, the carpet went down in 1 day.  I think this was the only...
Url
Tag
Img
Thumb
The painters finally stained the front door, after I reminded them a few times to remove it & NOT at...
Url
Tag
Img
Thumb
The shower enclosure was installed today, but they forgot the door sweep and handle, so they have to...
Url
Tag
Img
Thumb
The shower enclosure was installed today, but they forgot the door sweep and handle, so they have to...
Url
Tag
Img
Thumb
The landscapers wanted WAAAAY too much to build this wall, so I did it myself.  It took 2 trips to h...
Url
Tag
Img
Thumb
I added 3 layers of fabric to keep dirt from oozing through, and a french drain (hidden in the shado...
Url
Tag
Img
Thumb
There's half a load of chert (the gravel for the driveway) in the far background by the dumpster; th...
Url
Tag
Img
Thumb
The appliances are mostly in, but the stove isn't level, so the cabinet guys will have to come back ...
Url
Tag
Img
Thumb
I've been looking forward to having this grade fixed back close to natural so the rain stops eroding...
Url
Tag
Img
Thumb
The landscapers are carefully adjusting the grade for the runoff that I want, before planting the sh...
Url
Tag
Img
Thumb
The new Ikea store opened, and we found some curtains & rods we liked there.
Url
Tag
Img
Thumb
Good news - it fits.
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
After the landscapers finished grading & planting, they had most of the bare dirt hydromulched with ...
Url
Tag
Img
Thumb
I installed these pop-up floor outlets myself.
Url
Tag
Img
Thumb
It was nerve-racking drilling through the tile, but I put up the shower curtains, mirrors, towel bar...
Url
Tag
Img
Thumb
Most of the workers are finished making dust & hauling tools in, so I uncovered & cleaned the granit...
Url
Tag
Img
Thumb
Although it doesn't spread far through the house, the kitchen is still spacious enough to work in co...
Url
Tag
Img
Thumb
We plan to add a brushed stainless spatter guard on the wall between the microwave & stove.

[url=ht...
Url
Tag
Img
Thumb
The TV will go on the wall between the big door & the fireplace.

[url=https://www.supermotors.net/r...
Url
Tag
Img
Thumb
The 2 downstairs guest bedrooms are nearly identical.
Url
Tag
Img
Thumb
Her indoor swimming pool with TV that she can see from her vanity, too.  The ledge beside the shower...
Url
Tag
Img
Thumb
The master shower is large enough for a wheelchair, including the 3-foot door that swings in or out.
Url
Tag
Img
Thumb
My vanity has plenty of cabinets, and 4 outlets.
Url
Tag
Img
Thumb
Her vanity has 2 swivelling mirrors & a telescoping magnifying mirror.  Her outlets are behind one o...
Url
Tag
Img
Thumb
The laundry countertop is level with the dryer so it extends the usable area.  The coutertop will al...
Url
Tag
Img
Thumb
The washer is out of the way, but still very close to the master closets & bathroom, where most of t...
Url
Tag
Img
Thumb
The 2 downstairs guest bedrooms are nearly identical.
Url
Tag
Img
Thumb
Looking West out of the downstairs guest bedrooms.
Url
Tag
Img
Thumb
The view to the SW out of the downstairs guest bedrooms.
Url
Tag
Img
Thumb
Snow day...
Url
Tag
Img
Thumb
I put deadbolts in that match the handles: Schlage B60N CEN 619, with the strike reinforcement plate...
Url
Tag
Img
Thumb
There was a substantial gap under the threshold & door frame, so I filled it with concrete patch.  (...
Url
Tag
Img
Thumb
We spent a lot of time dremelling & hand-sanding the banister panels before I hauled them & the weld...
Url
Tag
Img
Thumb
My brushed look isn't as smooth as commercial stuff, but I think it's going to come out OK.

[url=ht...
Url
Tag
Img
Thumb
Fitting these is taking a lot longer than I expected, but so is everything else.
Url
Tag
Img
Thumb
I designed these to need minimal welding, but I still have to go back over the spots that are being ...
Url
Tag
Img
Thumb
I'm using this tubing cutter because I don't want to waste any of the length - not even a saw kerf.
Url
Tag
Img
Thumb
The angled cuts have to be done by saw, so I assembled this bandsaw that I bought last year.
Url
Tag
Img
Thumb
This was their first test-fitting after deburring & washing, and they all seem to have come out perf...
Url
Tag
Img
Thumb
After laying out the exact location, I'm drilling an 8"-deep 1.25"-wide 1/4"-thick ve...
Url
Tag
Img
Thumb
It takes some elbow grease to clean out the slot enough for the support to go in, but it needs to be...
Url
Tag
Img
Thumb
It's coming together slowly, but the pieces are fitting perfectly.
Url
Tag
Img
Thumb
The upper sections are just in-position right now - they're not supported yet.  The long 1/4" b...
Url
Tag
Img
Thumb
Just resting in-place, but it's looking the way I imagined.
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
They're still not finished, but all the pieces are fitted & installed. But I still have to disassemb...
Url
Tag
Img
Thumb
The bottom of each post support will have a lag screw below the wall, and several drywall screws abo...
Url
Tag
Img
Thumb
Rust-Oleum Crystal Clear Enamel Spray 596726 will give my brushed stainless a fingerprint-resistant ...
Url
Tag
Img
Thumb
This temporary handrail doesn't cover the posts, but it's enough to get a certificate of occupancy. ...
Url
Tag
Img
Thumb
The upper flight handrail is just attached to the wall studs.
Url
Tag
Img
Thumb
The view from the hallway.
Url
Tag
Img
Thumb
The view from the great room.
Url
Tag
Img
Thumb
We made 2 loads in this to get most of our stuff to the new house.  MY stuff will take several more ...
Url
Tag
Img
Thumb
I wanted to build a nicer-looking stainless mailbox & post, but we needed something up, so we bought...
Url
Tag
Img
Thumb
This is just outside the master bedroom door, which makes it hard to get a good pic within the narro...
Url
Tag
Img
Thumb
The process of moving in & settling is going slowly, but it's happening.
Url
Tag
Img
Thumb
The process of moving in & settling is going slowly, but it's happening. The back patio is nicknamed...
Url
Tag
Img
Thumb
FI-YAAAAA!!!

Contrary to my friends' speculation, I didn't set the county on fire, and no fire depa...
Url
Tag
Img
Thumb
I expected it to blaze for a few hours, but after the first blast, it died down quickly.  One of my ...
Url
Tag
Img
Thumb
One of my neighbors offered to help out with his (2nd) skidsteer.  He re-piled it a few times to kee...
Url
Tag
Img
Thumb
He's having way too much fun.

I'm going to try to buy his older skidsteer...
Url
Tag
Img
Thumb
The entry shelf is installed, and she'll start filling it soon.  That just leaves the office desk (&...
Url
Tag
Img
Thumb
Finished & loaded.
Url
Tag
Img
Thumb
I built this shed to move, and it made the trip without incident.
Url
Tag
Img
Thumb
Many of the bushes didn't last the first year.
Url
Tag
Img
Thumb
The trailer is nearly dragging the ground, even though I have as much weight as possible on the tong...
Url
Tag
Img
Thumb
These should keep everyone on the pavement.
Url
Tag
Img
Thumb
Because the gas company turned the trench around, they killed this big oak next to the house.  My fa...
Url
Tag
Img
Thumb
This backsplash is just resting here - I'll attach it later.
Url
Tag
Img
Thumb
The generator was surging, and it took a LOOOOONG time for Generac to fix it.  I'm not happy with th...
Url
Tag
Img
Thumb
Now that my leg is healed, I'm starting to think about the desk again.
Url
Tag
Img
Thumb
The ceiling split in 2 places during the cold weather, and several screws popped.
Url
Tag
Img
Thumb
I'm just getting back to the desk...
Url
Tag
Img
Thumb
We're staining & varnishing the desk parts, just like the one we put in the previous house.
Url
Tag
Img
Thumb
One of the leaking roof boots is being replaced.
Url
Tag
Img
Thumb
Rain & humidity will be scarce this week, so I'm digging the cable trench.  A friend loaned me his 1...
Url
Tag
Img
Thumb
This bulb auger wasn't long enough, so I welded another rod to it.  It's still not long enough, but ...
Url
Tag
Img
Thumb
This took longer than expected, but went smoothly.  There's enough cable to make a connection, but n...
Url
Tag
Img
Thumb
Repacking the drive & parking area was top priority.
Url
Tag
Img
Thumb
Getting through the trees in the circle and the other side of the loop took most of the morning.
Url
Tag
Img
Thumb
By Monday evening, I was more than 1/3 through.
Url
Tag
Img
Thumb
The boss grew up driving her father's tractor to mow their acreage, so she was a quick study on the ...
Url
Tag
Img
Thumb
Our couches were getting pretty worn-out, so when our furniture store announced a going-out-of-bidne...
Url
Tag
Img
Thumb
Our couches were getting pretty worn-out, so when our furniture store announced a going-out-of-bidne...
Url
Tag
Img
Thumb
The desk came out pretty much like I planned, at about 1/4 the cost that the finish carpenters bid. ...
Url
Tag
Img
Thumb
It didn't take her long to start moving into the closet, which is mainly there for her hobby stuff.
Url
Tag
Img
Thumb
The flower beds really filled-out this fall.
Url
Tag
Img
Thumb
The flower beds really filled-out this fall.
Url
Tag
Img
Thumb
The weather has been perfect for sitting out by the fire bowl & talking to the owls.

[url=https://w...
Url
Tag
Img
Thumb
The cabinet crew did a spectacularly BAD job of supporting the sinks, and the kitchen sink completel...
Url
Tag
Img
Thumb
One of the trees near the cable trench died, so now there's even MORE firewood.
Url
Tag
Img
Thumb
The fireplace is fully-functional, but we haven't needed to burn real wood in it yet.  So to make it...
Url
Tag
Img
Thumb
After I got done burying the 1,000 feet of RG11, I called to get it connected.  But they said it was...
Url
Tag
Img
Thumb
I had to use the zero-turn for the really-rough terrain because it's a heavier & stronger mower.  I ...
Url
Tag
Img
Thumb
Since I had dug it just a year before with the track-hoe, I was able to use this lighter, cheaper tr...
Url
Tag
Img
Thumb
This crew is only setting an empty plastic box on the ground around the end of the cable that I buri...
Url
Tag
Img
Thumb
This crew is boring under the road to extend their system closer to my cable.  But they're not conne...
Url
Tag
Img
Thumb
The next crew actually connected all the cable sections to their system, and checked the signal stre...
Url
Tag
Img
Thumb
    

About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2022 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog