The plan...
IF THE IMAGE IS TOO SMALL, click it.
Url
Tag
Img
Thumb
The guy who built the driveway did the initial clearing for the shop, but he left some stumps and de...
Url
Tag
Img
Thumb
We removed a few more trees (unfortunately), dug up the mud, and pushed it out to the sides to dry.
Url
Tag
Img
Thumb
We removed a few more trees (unfortunately), dug up the mud, and pushed it out to the sides to dry.
Url
Tag
Img
Thumb
Then we started bringing in good clay.
Url
Tag
Img
Thumb
It took about a dozen well-packed loads to bring it up to grade
Url
Tag
Img
Thumb
It took about a dozen well-packed loads to bring it up to grade.
Url
Tag
Img
Thumb
After a couple of months settling, we set forms & started digging.
Url
Tag
Img
Thumb
After a couple of months settling, we set forms & started digging.
Url
Tag
Img
Thumb
The plumber started tearing up the pad, bringing in water from the well, and running a septic line b...
Url
Tag
Img
Thumb
The plumber started tearing up the pad, bringing in water from the well, and running a septic line b...
Url
Tag
Img
Thumb
Then the turn-down was dug...
Url
Tag
Img
Thumb
...followed by the seven 4x4x4' column footers.
Url
Tag
Img
Thumb
The trench drain was set in, and a grease trap was built before it dumps outside.
Url
Tag
Img
Thumb
The green pipe is a valve box for future expansion of my water system.
Url
Tag
Img
Thumb
The anchor bolts are hanging, and the first of a LOT of rebar is going in.
Url
Tag
Img
Thumb
They're working on the 7th footer, for the inside mezzanine column.
Url
Tag
Img
Thumb
We poured the footers & some of the turn-down the first day.
Url
Tag
Img
Thumb
We poured the footers & some of the turn-down the first day.
Url
Tag
Img
Thumb
Afterward, we set up for the rest of the turn-down & the main slab.
Url
Tag
Img
Thumb
Ready for tomorrow...
Url
Tag
Img
Thumb
The slab foreman forgot to order the concrete, so we got a really-late start.  It took about 2 truck...
Url
Tag
Img
Thumb
The last truck cleaned out around 3PM, which is ridiculously late for such a small slab, and it put ...
Url
Tag
Img
Thumb
4 hours later, it was barely tight enough to start trowelling.
Url
Tag
Img
Thumb
They finished around 10PM, but they did a helluva job.  This slab looks better than the house slab d...
Url
Tag
Img
Thumb
It was sawcut the following morning, and then I hosed it off.
Url
Tag
Img
Thumb
Three days after the slab was finished, we took delivery of the building.
Url
Tag
Img
Thumb
I have an erection...
Url
Tag
Img
Thumb
The main structure went up relatively quickly, but we found several small errors that the manufactur...
Url
Tag
Img
Thumb
Even though it wasn't part of their contract, they set some of the mezzanine beams for me.
Url
Tag
Img
Thumb
The East wall sheeting went on quickly because there's only 1 framed opening in it.
Url
Tag
Img
Thumb
The North sheets went up next.
Url
Tag
Img
Thumb
These windows were left over from the house, so I decided to use them here.  That caused some proble...
Url
Tag
Img
Thumb
The South sheeting took a lot longer than the others because of the 3 framed openings (1 sheeted ove...
Url
Tag
Img
Thumb
With the South sheets up, the cantilevers could go on.
Url
Tag
Img
Thumb
The pile in the foreground is the mezzanine, which I'll put up later.
Url
Tag
Img
Thumb
West sheeting is started, and the roof is complete.  They plan to finish tomorrow.
Url
Tag
Img
Thumb
It's almost finished, but that rake trim wasn't shipped, so it'll have to be ordered in.  The fan is...
Url
Tag
Img
Thumb
The replacement fan arrived in better condition than the first.
Url
Tag
Img
Thumb
I moved the mezzanine framing inside, but I'm not looking forward to lifting the 4 large beams.
Url
Tag
Img
Thumb
The rake trim arrived, and the erectors came back one evening to put it on.
Url
Tag
Img
Thumb
My neighbor offered to lift the beams with his tractor, so it took a lot less time & effort than I e...
Url
Tag
Img
Thumb
We also set the fan, but it's not wired up yet, or even screwed in.  I just put some straps around i...
Url
Tag
Img
Thumb
The electrical inspector required that a ground wire be added (even though I put a local ground rod ...
Url
Tag
Img
Thumb
The electricians returned to tie the shop wiring into the meter base.
Url
Tag
Img
Thumb
It took a while, but the overhead doors are installed, so I can start moving junk inside.
Url
Tag
Img
Thumb
The installers didn't put the tracks where they belong, so they had to come back & re-do 2 of the do...
Url
Tag
Img
Thumb
I started laying out the stairs, cutting the stringers to shape, bending them, and grinding off thei...
Url
Tag
Img
Thumb
I had to re-hang one of the mezzanine beams, and cut a little off its flanges to make room for the s...
Url
Tag
Img
Thumb
After a lot of careful measuring, they're in & solid.
Url
Tag
Img
Thumb
My welds came out pretty good - even the verticals & overheads.  I'll clean & re-prime them later.
Url
Tag
Img
Thumb
I had to negotiate with Lowe's for a while to get them to send a delivery driver who'd drive the for...
Url
Tag
Img
Thumb
I had to negotiate with Lowe's for a while to get them to send a delivery driver who'd drive the for...
Url
Tag
Img
Thumb
The stairs came out just the way I imagined - large enough to carry big stuff up here, but still out...
Url
Tag
Img
Thumb
I found a 60' roll of 2" grip tape for $24, so this is 2 strips on each tread.  I even managed ...
Url
Tag
Img
Thumb
I thought about making this height-adjustable, but I couldn't think of a way to do it that I thought...
Url
Tag
Img
Thumb
Moving such a big compressor alone over rough ground was challenging, but it worked out.
Url
Tag
Img
Thumb
It's not bolted down or connected to anything yet, but it's in-place. A SpeedAir Maxline M7500 kit i...
Url
Tag
Img
Thumb
The $32 (shipped) 4' compressor hose (PN: 54075K57) came from McMaster-Carr.

In the meantime, I hav...
Url
Tag
Img
Thumb
This RapidAir Maxline M7500 kit is lower-priced (per foot), easier, quicker, & better than PVC, Iron...
Url
Tag
Img
Thumb
I carefully sloped all the air lines so most of the condensate will drain back to the tank, which th...
Url
Tag
Img
Thumb
It took a long time, but I found a concrete finisher to put the aprons around the shop, spread grave...
Url
Tag
Img
Thumb
It took a long time, but I found a concrete finisher to put the aprons around the shop, spread grave...
Url
Tag
Img
Thumb
This driver had no trouble getting this truck backed in along the building & turned for the first po...
Url
Tag
Img
Thumb
While the concrete was curing, the gravel arrived.  There's also a large gravel turning/parking area...
Url
Tag
Img
Thumb
After a couple of hours spreading gravel, the track broke. It took the rental company a couple more ...
Url
Tag
Img
Thumb
This ~$50 dusk-to-dawn LED from Sam's (above the fan louver) lights up the whole area, all the way t...
Url
Tag
Img
Thumb
I've been dreading cutting all this cement board for the shower/toilet, but it was overdue.  Now, I ...
Url
Tag
Img
Thumb
These 80' 1/2"ID hose reels were on ridiculously-low sale at TSC, so I snagged 3.
Url
Tag
Img
Thumb
I modified this SkatBlast cabinet, and routed the exhaust out the side of the shop so there will be ...
Url
Tag
Img
Thumb
Another Christmas sale item from TSC!
Url
Tag
Img
Thumb
Sam's online had this 10-pack of shop lights on sale, so I ordered a box to go with the ~6 similar o...
Url
Tag
Img
Thumb
I backed into the sump vent pipe with the excavator, so I hole-sawed out the broken bung, and replac...
Url
Tag
Img
Thumb
This is where my Rotary SM122-122 sat behind my friend's house for about 3 years after taking it dow...
Url
Tag
Img
Thumb
This Rotary 4-post lift was installed outdoors many years ago, and used there for at least a decade....
Url
Tag
Img
Thumb
My original plan was to clean & paint it outdoors, and then figure a way to move it inside and insta...
Url
Tag
Img
Thumb
This column is relatively thin, and something apparently ran into it.  With some lumber bracing, I f...
Url
Tag
Img
Thumb
The runways were apparently lowered onto solid objects a few times, so they have several bends in th...
Url
Tag
Img
Thumb
This floor jack hasn't even lifted a car yet, but it was perfect for un-bending the runways.
Url
Tag
Img
Thumb
Everything was filthy; both from years of use, and from sitting in the woods for a few years.  So af...
Url
Tag
Img
Thumb
I flipped the runways back & forth a few times for pressure washing over several weeks before painti...
Url
Tag
Img
Thumb
The yokes & columns got pressure washed again before painting inside (the columns) & out.
Url
Tag
Img
Thumb
I wirewheeled the threads clean before painting the latch bars.
Url
Tag
Img
Thumb
The ram had been pressure-washed earlier, but I scuffed & washed it again before painting it gloss b...
Url
Tag
Img
Thumb
I had already cleaned the sheaves & cables months ago, but all these little pieces got wirewheeled &...
Url
Tag
Img
Thumb
Using the Bronco, the POS trailer, the engine hoist, some furniture dollies, some chain, and a few r...
Url
Tag
Img
Thumb
It wasn't easy getting all the pieces in, arranged, and attached - working alone.  But it was probab...
Url
Tag
Img
Thumb
After squaring it, centering each column on its yoke end, marking them on the floor, and removing th...
Url
Tag
Img
Thumb
The shop isn't actually as clean as it looks here.
Url
Tag
Img
Thumb
I goofed...

When I designed the shop, this lift was in the woods, and I didn't feel like measuring ...
Url
Tag
Img
Thumb
I used a long prybar & wood blocks to raise the lift enough to get the floor jack under it, to raise...
Url
Tag
Img
Thumb
I made the other 2 yoke covers.
Url
Tag
Img
Thumb
Parts arrived, including a hose 4' longer, 2 new sheaves,  anchor bolts & shims, and a few plastic p...
Url
Tag
Img
Thumb
With the new sheaves, I could make the final adjustments on the cables so the lift is suspended ~3/1...
Url
Tag
Img
Thumb
It's liftivating...
Url
Tag
Img
Thumb
After stealing back its pump, the lift is back in action.  But the lock-release air valve leaks badl...
Url
Tag
Img
Thumb
This is only about half its capacity, but I needed to check it with something.
Url
Tag
Img
Thumb
View from the 2nd floor.
Url
Tag
Img
Thumb
To free up my flashlight hand, I added these 110VAC LEDs to the lift.  They're attached to flexible ...
Url
Tag
Img
Thumb
To make the LEDs automatic, I wired them to this paddle switch. When I lower the lift onto the locks...
Url
Tag
Img
Thumb
I found 2 of these cans on sale, but it looks like I need one more.
Url
Tag
Img
Thumb
To stop the cylinder dumping the fluid that leaks by the piston onto the floor when the lift is full...
Url
Tag
Img
Thumb
Grouting the shower wasn't fun, which is why my friend who did the tile didn't want to do it.  But a...
Url
Tag
Img
Thumb
I ended up grouting the floor & setting the toilet myself, but it came out pretty well.
Url
Tag
Img
Thumb
This might be my best shop equipment.  And since it's also a shower, I'll never have to scrub it to ...
Url
Tag
Img
Thumb
Since these 4' shop LEDs are becoming common & affordable, and they come with 6' cords, I put up swi...
Url
Tag
Img
Thumb
The 2nd welder outlet is in the stair stringer.
Url
Tag
Img
Thumb
The upstairs lights are on a switch slaved to the main lighting circuit (which has 2 3-way switches)...
Url
Tag
Img
Thumb
The wall outlets are welded high so they won't get wet if I have to wash the floor, and I've started...
Url
Tag
Img
Thumb
The light above the fan is a dusk-to-dawn LED flood, which is MUCH brighter than it appears here.  T...
Url
Tag
Img
Thumb
The ramps were bent years before I got the lift, and I decided to fix them today.  I used the lift (...
Url
Tag
Img
Thumb
A local business is moving out of a leased building, and they couldn't move or store all the lifts, ...
Url
Tag
Img
Thumb
After a few months, I bolted it down.  It works, but now I have to get the '93EB out of there to use...
Url
Tag
Img
Thumb
The same business was clearing out some parts cabinets & shelving, so I brought a couple home.
Url
Tag
Img
Thumb
This light-duty pivoting boom should be strong enough for skinning deer & lifting lawn mowers, AFTER...
Url
Tag
Img
Thumb
I had thought this couldn't happen for years, but it turned out to be easier & quicker than I expect...
Url
Tag
Img
Thumb
The first lift was a light load.
Url
Tag
Img
Thumb
This cheapo 300kg (660 lbs) winch on a cheapo 1-ton beam trolley will make lifting & loading easier....
Url
Tag
Img
Thumb
After a lot of thought about its position, I decided to cut the exhaust hose port 5' above ground, t...
Url
Tag
Img
Thumb
 

About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2022 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog