File 476 of 476
Prev | Next

Url
Tag
Img
Thumb

20191001_094925.jpg The next crew actually connected all the cable sections to their system, and checked the signal strength outside my house.  The last time they told me I put in the wrong cable, they said it was because it wouldn't carry the signal well enough over that distance, and that P3-875-JCASS was necessary.  This meter indicates I have at least 4x the necessary signal strength; about 3x better than most houses near the pavement.

But I'm still at least 1 more visit away from service, and that's going to be about 2 weeks.
20191001_094925.jpg | Hits: 67 | Posted on: 10/15/19 | View original size (2.01 MB)

The next crew actually connected all the cable sections to their system, and checked the signal strength outside my house. The last time they told me I put in the wrong cable, they said it was because it wouldn't carry the signal well enough over that distance, and that P3-875-JCASS was necessary. This meter indicates I have at least 4x the necessary signal strength; about 3x better than most houses near the pavement.

But I'm still at least 1 more visit away from service, and that's going to be about 2 weeks.
About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2022 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog