Advertisement:
AFabrail.jpg
102 hits | 45.97 KB | Posted: 5/3/05

Ahacksawcutting.jpg
119 hits | 40.33 KB | Posted: 5/3/05

Cut legs off
awheelmtnedontop.jpg
102 hits | 37.75 KB | Posted: 5/3/05

Mount two wheels, one small & one large on bottom & one small on top.
Acleanline.jpg
100 hits | 87.23 KB | Posted: 5/3/05

Dig out a level line for cement blocks
Acompletedline.jpg
106 hits | 77.02 KB | Posted: 5/3/05

Lay out all cement blocks and ensure they are level
asupervisordog.jpg
98 hits | 59.6 KB | Posted: 5/3/05

Call in the supervisor.
Anextention.jpg
120 hits | 61.66 KB | Posted: 5/3/05

Build the extention of the building to fit the gate size.
afirstrailon.jpg
107 hits | 74.05 KB | Posted: 5/3/05

Had the supervisor check the level of cement blocks then added the lattice.
atoprailon.jpg
101 hits | 62.36 KB | Posted: 5/3/05

Gate in bottom rail and then level and mount top rail.
analmostfinishedgate.jpg
130 hits | 53.79 KB | Posted: 5/3/05

Extend gate to ensure proper movement and alignment.
acompletegate.jpg
113 hits | 69.59 KB | Posted: 5/3/05

Gate complete, no supervisor will be going through this gate anytime soon.


About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2009, LHB Companies LLC, DBA SuperMotors.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog