york0000.JPG
344 hits | 56.48 KB | Posted: 4/2/07

5x0.25 13,6,2 and triangle 6x6x0.325
york0001.JPG
288 hits | 60.2 KB | Posted: 4/2/07

using a yourk to align the plates for welding
york0002.JPG
274 hits | 46.09 KB | Posted: 4/2/07

set the spacing to use the rear pulley
york0003.JPG
268 hits | 55.08 KB | Posted: 4/2/07

plug ugly welding but it holds well
york0005.JPG
292 hits | 55.61 KB | Posted: 4/2/07

a little rattle can later
york0004.JPG
286 hits | 62.79 KB | Posted: 4/2/07

before
york0006.JPG
280 hits | 61.28 KB | Posted: 4/2/07

after, runs great and kicks 5 gallons to 105 psi in about 15 seconds, very very cool
york0008.JPG
286 hits | 11.06 KB | Posted: 4/2/07

layout
york0009.JPG
295 hits | 48.77 KB | Posted: 4/16/07

Air filter, check valve, guage, switch
york0010.JPG
291 hits | 61 KB | Posted: 4/16/07

vilter and pop off valve on the compressor
york0011.JPG
296 hits | 53.61 KB | Posted: 4/16/07

two SCBA tanks mounted under the bed on the drivers side

About SuperMotors | Contact Us | FAQ/Help | Legal
Copyright © 1998-2024 Web Design Solutions, Inc.
All rights reserved. Duplication & reproduction is strictly prohibited.
SuperMotors.net v5.0.2 ChangeLog