The South sheeting took a lot longer than the others because of…
The South sheeting took a lot longer than the others because of the 3 framed openings (1 sheeted over for now).
Is this accurate? Sign in to help verify it.
The South sheeting took a lot longer than the others because of the 3 framed openings (1 sheeted over for now).
Is this accurate? Sign in to help verify it.
No comments yet.