|
|
 Hits: 886 Size: 26.62 KB Posted: 12/21/06 Publication Date: FEBRUARY 3, 1997
LIGHT TRUCK:
1980-96 BRONCO, F-150, F-250 LD
1980-97 F-250 H... |  Hits: 452 Size: 12 KB Posted: 12/21/06 3. INSPECT FRAME BOLTS FOR PROPER INSTALLATION TORQUE
Inspect and tighten all front end component... |  Hits: 318 Size: 11.36 KB Posted: 12/21/06 Knock the rivet pin out of the blind side with a 6.35mm (1/4") drift punch and hammer (Figure 2).
... |  Hits: 300 Size: 11.01 KB Posted: 12/21/06 > Cut the rivet's head off with a hammer and flat chisel (Figure 3).
Click "Next" beside the ima... |  Hits: 287 Size: 10.02 KB Posted: 12/21/06 > Knock the sleeve out of the blind side with a 9.525mm (3/8") drift punch and hammer (Figure 4).
... |
 Hits: 461 Size: 41.32 KB Posted: 12/21/06 2. After removing the rivet, verify the noise came from this location by pounding a wedge between th... |  Hits: 319 Size: 42.73 KB Posted: 12/21/06 5. Install a 9/16" Grade 8 torque prevailing Nut (34990-S2) with a Washer (44880-S2) and a Grade 8 B... |  Hits: 397 Size: 29.33 KB Posted: 12/21/06 a. Slide the bolt and washer into the "window" opening on the outside of the frame siderail, and ins... |  Hits: 318 Size: 30.35 KB Posted: 12/21/06 a. Torque all three (3) bolts/nuts at the crossmember-to-frame siderail at the wraparound side (Figu... |  Hits: 281 Size: 24.66 KB Posted: 12/21/06 a. Torque the gusset-to-frame bolts (Figure 8, Number 1).
b. Torque the crossmember-to-frame bolt... |
 Hits: 263 Size: 82.21 KB Posted: 12/21/06 Warranty LABOR ALLOWANCE
Click "Next" beside the image above to continue. |  Hits: 298 Size: 24.18 KB Posted: 12/21/06 DEALER CODING
OASIS CODES: 305000, 390000, 702000, 702100
If viewing a single image per page, c... | | | |