File 1 of 8
Prev | Next

Share This
Embed
Tag
Img
Thumb


If player doesn't work - click to watch:
Start up, idle and revving. 2 feet of pipe from cat, into a 45 degree bend and into a 3 1/2 x 20 tip exiting before the rear tire.

100_2379.mov | Hits: 920 | Posted on: 7/6/05 | Download original movie file (Size: 6.03 MB)

Start up, idle and revving. 2 feet of pipe from cat, into a 45 degree bend and into a 3 1/2 x 20 tip exiting before the rear tire.