File 29 of 31
Prev | Next

Share This
Url
Tag
Img
Thumb

dsc00191.jpg  now that in 60 days ,I got the 94 and 79 stang into running driver%u2019s.
 the next in line is the  84 convertible.
first, to get the 2-1/2 inch exhaust installed. 
second, then get the 1984 302-4V running .
third ,swap on the 87 front spindles/sway bars.



 what had put this project on hold was trying to find a good trunk lid. well I got one , so now time to play!
dsc00191.jpg | Hits: 469 | Posted on: 5/23/11 | View original size (1.71 MB)

now that in 60 days ,I got the 94 and 79 stang into running driver%u2019s.
the next in line is the 84 convertible.
first, to get the 2-1/2 inch exhaust installed.
second, then get the 1984 302-4V running .
third ,swap on the 87 front spindles/sway bars.



what had put this project on hold was trying to find a good trunk lid. well I got one , so now time to play!