File 8 of 67
Prev | Next

Share This
Url
Tag
Img
Thumb

dsc00430.jpg As of Saturday night, 10/29/05.  The only things connecting the body to the frame are the brake lines, speedometer cable, fuel filler hose (with clamps removed), and eight body mount bolts.

We removed everything mentioned above except the body mount bolts Sunday morning, and spent the rest of Sunday with the IR impact gun, rotary cutoff tool, air hammer, cold chisels, 4 lb. "persuader", and lots of Liquid Wrench and Kroil -- all to get the first *five* body mount bolts out.  Hope to get the rest this week.
dsc00430.jpg | Hits: 754 | Posted on: 10/31/05 | View original size (148.63 KB)

As of Saturday night, 10/29/05. The only things connecting the body to the frame are the brake lines, speedometer cable, fuel filler hose (with clamps removed), and eight body mount bolts.

We removed everything mentioned above except the body mount bolts Sunday morning, and spent the rest of Sunday with the IR impact gun, rotary cutoff tool, air hammer, cold chisels, 4 lb. "persuader", and lots of Liquid Wrench and Kroil -- all to get the first *five* body mount bolts out. Hope to get the rest this week.