Out off-roading with the Bronco after a rejetting and rebuilding the Holley 4bbl. It ran amazing. Only problem I had was vapor lock, which is something I'll need to address, probably with some fuel line re-routing. Waiting 20 - 30 minutes for the fuel to cool down in 105 degree weather is no fun.