This document details the procedure for adjusting the mainshaft and differential side bearing preload, including torque specifications.
MAINSHAFT & DIFF. SIDE BEARING PRELOAD ADJUSTMENT 10. To make sure the correct thickness of shim is selected, measure the following: Turning torque of final drive only C2) Total turning torque (measure after all component parts are assembled) (1) Insert differential side bearing adjusting shimls) into transmission case and install final drive assembly to clutch housing. Tighten transmis- sion case bolts. Then measure turning torque. suresz Final drive turning torque (New bearing): 1.5 3.4 N-m (15 - 35 kg-cm, 13 - 30 inlb) When old bearing is used again] preload will be slightly lower than that indicated above. Check preload to see if it is not far from specified range. (2) Assemble all component parts, referring to "Reassembly". Then measure turning torque. Total turning torque: Overall 2.9 A 7.4 N-m (30 - 75 kgcm, 26 - 65 in-lb) Compared with final drive only 1.5 - 3.9 N-m (15 -4D kg-cm, 13 -35 inlbi When old bearing is used again, preload will be slightly lower than that indicated above. Check preload to see if it is not far from specified range,
No comments yet.