Technical diagrams detail the process of cylinder head inspection and valve guide replacement.
CYLINDER HEAD Inspection (Cont'd) Replacement Replace valve or valve guide. 1. Heat cylinder head to 150 to 160C (302 to 320F) and drive out valve guide with a press [under a 20 kN (2t, 2.2 US ton, 2.0 Imp ton) pressure] or hammer, and suitable tool. semen SEMsn Amuaa , 2. Ream cylinder head valve guide hole. ssmsu 3. Heat cylinder head to 150 to 160C (302 to 320F) and press service valve guide into cylinder head. //:_\ 12. 7- I33 mm (0500- 051 in) e? 4. Ream valve guide. Finished size: 7.005 - 7.020 mm (0.2758 - 0.2764 in) SEM542 SEMOO7
No comments yet.