dscn5908.jpg | Hits: 385 | Posted on: 2/15/08
| View original size (64.64 KB)
The new foot is made out of 2 1/2" box tubing with a 1/4" wall. I didn't want it to fill up with water and mud, so I welded in a couple DOM tubes, and then capped the ends.