I still have to run the silicone vacuum lines; mount the charcoal canister, and install the plastic reservoir; but the engine is pretty much done. It passed the coolant pressure test, but the PSF needs to be topped-up after the engine runs.
IF THE IMAGE IS TOO SMALL, click it.
Still to do:
- horns
- fuel pump access
- pinion bearing preload
- ATF filter
- swingaway bushing
No comments yet.