Shop Foundation Plan Drawing - Grid C3-C21, S-2 Section Callouts & Dimensions

Photo of a structural foundation plan with column grid and dimension callouts
Photo of a structural foundation plan with column grid and dimension calloutsOriginal file
Photo of a structural foundation plan with column grid and dimension callouts

Reference · 1992-1996 BroncoAll 81 blueprints

Shop Foundation Slab Plan Blueprint - 60' x 52' Layout with Section Details S-2 Shop Foundation Plan Drawing - Grid C3-C21, S-2 Section Callouts & Dimensions Lot Plan CAD Drawing - Property Site Plan Sketch (1995 Ford Bronco Gallery) Brake Booster to Master Cylinder Adapter Plate Blueprint - Ford Bronco Swap 12" Single Ported Subwoofer Box Cut Sheet & Blueprint (HDS/HDC 12" Subs) 1994 Ford Bronco Custom Sub Box Top View Blueprint - Dimensions & Layout Subwoofer Box Front Baffle Blueprint: 25.25x14 in Panel, 11.25/12.88 in Cutouts Crankshaft Spacer/Balancer Shim Blueprint MC 98264A225 - Dimensions & Specs Ford Bronco SD Seat Adapter Passenger Side Brackets Blueprint - Dimensions Super Duty Seat Adaptor Plate Blueprint v2 - Ford Bronco Seat Swap Dimensions 1992 Ford Bronco complete underbody frame dimensions, top and side views with 2659 mm (104 11/16 in) wheelbase Ford Bronco Super Duty Seat Adapter Top Plate Blueprint - Dimensions & Hole Layout 81blueprints1992-1996 Ford Bronco More reference 1996 Ford Bronco C202F 76-Pin Connector Pinout - EVTM Page 150-4Wiring diagram 1996 Ford Bronco/F-150 Distributor Exploded Parts Diagram & Installation 03-07A-6Exploded parts Ford EEC-IV Output State Check & Cylinder Balance Test - Code Reader ProcedureService procedure 1994 Ford Bronco Door Data Spec Plate - VIN, GVWR, Axle & Paint CodesSpec plate BMW M3 Owner's Manual Page 3 - Engine Compartment Component LocationsManual page 1993 Ford V8 Serpentine Belt Routing Diagram - Pulley Layout (Q2601-E)Schematic 1994-1995 BMW 3 Series Owner's Manual Booklet Set - Warranty, Radio & AccessoriesBrochure 1995 Ford Bronco 5.8L Emissions/VECI Label - Vacuum Hose Routing DiagramVacuum routing Ford Bronco/F-Series Fuse 18 (10A) - Speedometer, Air Bag, Shift ControlFuse chart Rod Bolt Stretch Monitoring Chart - 8-Rod V8 Connecting Rod Bolt Record SheetTorque spec

Structural foundation/slab plan showing a column grid (C1-C14), dimensions and detail callouts.

Part of 1992-1996 Ford Bronco Blueprints

AI caption · Photo 1201 of 1229

This scan is a portion of an architectural/structural foundation plan drawing (site-labeled as part of a 'shop foundation drawing' set) that was uploaded to a 1995 Ford Bronco gallery, but it contains no automotive content. The sheet shows a plan view of a building foundation with a rectangular grid of column/gridline callouts labeled C3 through C21 running along the top, bottom, and right edges. Dashed lines indicate footings or grade beams beneath the slab grid. Several section cut markers reference details on sheet S-2, including sections A, B, L, and M. Overall dimensions are given along the right edge: 8'-6 1/2", 52'-5 1/2", 9'-1", and 12'-0", the last apparently for a lower rectangular slab or apron area spanning roughly gridlines C5 to C14. Handwritten field notes in ink mark a location near gridline C8 as 'rebar,' call out a 24" dimension between tick marks, and note the slab or wall there is '8" thick.' A reader can learn the grid layout, section references to sheet S-2, key overall dimensions, and the annotated rebar location and slab thickness. No title block, date, or vehicle applicability information is visible.

Is this accurate? Sign in to help verify it.

Frequently asked questions

What sheet do the section callouts on this foundation plan reference?
All visible section markers (A, B, L, and M) reference details on sheet S-2.
What overall dimensions are shown on this foundation plan?
Dimensions along the right edge include 8'-6 1/2", 52'-5 1/2", 9'-1", and 12'-0".
What do the handwritten notes on the drawing indicate?
Handwritten ink notes mark a 'rebar' location near gridline C8, a 24" dimension between tick marks, and an '8" thick' callout for the slab/wall in that area.
How are the gridlines labeled on this plan?
Column/gridlines are labeled C3 and C4 at top, C5 through C14 across the middle, and C15 through C21 along the right edge.